background image

EATON 

wb-xp2-en

6

Joint Pack

Step 1.

Mount Busbar A fi rmly to the Unistrut®

Step 2.

Attach the rear joint pack cover to 

Busbar A

Busbar A

Socket screw X2

Rear joint 
pack cover

Step 3.

 

Install joint pack, never 

force the joint or strike it 

with any object, as this 

may damage the joint or 

the busbar section. The 

joint should be inserted 

by means of constant 

force i.e. pushing by hand 

or means of a suitable 

clamping arrangement. The 

images show 2 methods of 

installing the joint pack.

* Before joining the two 

separate sections of the 
Busbar trunking, ensure 
that all contact surfaces 
are: 

 free from contaminates

 unblemished

 not damaged 

 correctly aligned

Step 4. 

a) 

Position 

Busbar B as shown 

in the image. Ensure 

that the Earth side plate is not 

overlapping the Expansion Rib. 

Ensure the 2 sections of Busbar 

trunking are 275mm ±1mm apart 

and that the joint pack is centred 

between them.

b)

 Mount Busbar B fi rmly to the 

Unistrut®.

c)

 Attach the rear joint pack cover to 

the Busbar B.

Busbar A

Earth side plate

Expansion Rib

Busbar B

The steps below outline best practice, the Busbar orientation and site conditions may restrict installers from adhering to this 

methodology. In these cases installers must be cautious and ensure the joint pack is installed correctly. Ensure all parts are 

meggered and visually inspected prior to installation.

Содержание Power Xpert XP2

Страница 1: ...Power Xpert XP2 Power Xpert XP2 Installation Manual Installation Manual www eaton eu busbars OHSAS 18001 2007 OHS 533652 ISO 9001 2008 FM 12680 ISO 14001 2004 No EMS 566536...

Страница 2: ...ot exceed the safe working load of the lifting apparatus Ensure that equipment is used as per manufacturer s guidelines Storage The Busbar will be delivered to the customer neatly stacked on a wooden...

Страница 3: ...ific area Eaton recommend that the fixing brackets must be mounted no more than 500mm from the centre of the joints For vertical riser installation of sections greater than 2 metres it may be easier t...

Страница 4: ...t is the responsibility of the support system supplier to ensure their system can safely support the weight of our product Please note Eaton fixing bracket s must be used Drilling or cutting the busba...

Страница 5: ...to Unistrut with M10 Hex Bolt and Lock Nut tighten the bolts to 45Nm 5Nm Step 4 Attach Spring Hanger Brackets to Busbar using fixing brackets Step 5 Tighten the joint pack to 65Nm 5Nm once the spring...

Страница 6: ...ntact surfaces are free from contaminates unblemished not damaged correctly aligned Step 4 a Position Busbar B as shown in the image Ensure that the Earth side plate is not overlapping the Expansion R...

Страница 7: ...on Step 1 Mount Busbar to frame Step 2 Install the Joint Pack Elbow to Busbar never force the joint or strike it with any object as this may damage the Joint or Busbar section The joint should be inse...

Страница 8: ...EATON wb xp2 en 8...

Страница 9: ...e required to install the Cable End Box following the instructions shown Unistrut rail Access cover Gland plate 2 3 M10 Channel Nut M10 Bolt 1 Unistrut rail 2 Access cover 3 Gland plate Tap Off Cover...

Страница 10: ...ng brackets Step 4 Offer the tap off box up to the shutter housing and visually line up the earth contact bracket and actuator to ensure correct location of the tap off contacts The box cannot be inse...

Страница 11: ...sitive ON OFF operation Examine protective device for sign of short circuit operation If a short circuit has occurred on the equipment connected to the tap off module check operation of device and the...

Страница 12: ...aton eu Eaton Electric Ltd 270 Bath Road Slough Berkshire SL1 4DX Tel 01753 608 700 Email systemquotes eaton com www eaton com To contact an Eaton salesperson or local distributor agent please visit w...

Отзывы: