EATON
wb-xp2-en
10
Tap Off Modules
Step 1.
In accordance with isolation procedures and risk
assessments to be carried out by the installer, ensure
complete isolation of the electrical busbar by proving dead.
Step 2.
Following removal of the tap off unit from its packaging,
check the device is not damaged and tap off contacts are
visually in line.
Step 3.
Open door using key provided and release both clamping
mechanisms by using a 6mm t-bar in an anticlockwise
direction.
Tap off box
MCCB
Lock
Secure rear fi xing brackets
Step 4.
Offer the tap off box up to the shutter housing and visually
line up the earth contact bracket and actuator to ensure
correct location of the tap off contacts.
The box cannot be inserted upside down as the design of
the actuator mechanism prevents this.
Insert the tap off box until base of tap off box fi nishes fl ush
with busbar assembly.
Use the 6mm t-bar to clamp the tap off box to the busbar
assembly by rotating the clamping mechanism in a
clockwise direction.
Step 5.
Install the rear fi xing brackets as illustrated below.
Step 7.
Megger test installation prior to re-energisation of busbar.
Step 8.
Before turning the Breaker “ON”, ensure the neutral link is
connected and tightened.
Handle
Содержание Power Xpert XP2
Страница 8: ...EATON wb xp2 en 8...