www.eaton.com
IB02601007E
Page 9
2 Quick Start Guide for the Meter Module
2. Configure the Security Mode Dip Switches:
3. Planning CT and VT Connections (Figure 3)
Determine your wiring requirements for the meter module. This quick start guide will cover
these basic wiring configurations:
• 3-Phase, 3-Wire Delta( Up to 600 V L-L, 347 L-N) 3CTs
• 3-Phase, 3-Wire Delta (Above Up to 600 V L-L, 347 L-N) 3CTs
• 3-Phase, 3-Wire Delta (Above Up to 600 V L-L, 347 L-N) 2 CTs
• 3-phase,4-Wire Y (Up to Up to 600 V L-L, 347 L-N)
• 3-phase,4-Wire Y (Above Up to 600 V L-L, 347 L-N)
See Installation, for wiring diagrams.
DS-1 DS-2
DS-3
OFF OFF
ON is
Normal.
OFF is
Safe
Mode
No restrictions (user ID/Password re
-
quired)
ADMIN/ADMIN accepted for 15 minutes
after boot-up
OFF
ON
ON is
Normal.
OFF is
Safe
Mode
Medium Security - Energy & Demand
resets prohibited
ON
OFF
ON is
Normal.
OFF is
Safe
Mode
High Security- Configuration changes;
Energy & Demand reset prohibited
ON
ON
ON or
OFF
Factory Test Mode - The meter should
never be operated in this mode. The meter
will indicate that it’s in factory test mode
through a repeating series of three flashes
on the
red
Status LED
Содержание Power Xpert Meter 4000
Страница 4: ......
Страница 6: ...Page 6 IB02601007E www eaton com 1 Introduction...
Страница 18: ...Page 18 IB02601007E www eaton com 2 Quick Start Guide for the Meter Module...
Страница 23: ...www eaton com IB02601007E Page 23 3 Mounting and Wiring...