UPS Operating Instructions
This section describes how to operate the UPS using the color touchscreen control.
NOTE
Before starting the UPS, ensure all installation tasks are complete and a preliminary startup has
been performed by authorized service personnel. The preliminary startup verifies all electrical
interconnections to ensure the installation was successful and the system operates properly.
NOTE
Read this section of the manual and have thorough knowledge of UPS operation before attempting
to operate any of the controls.
NOTE
The UPS displays 2 minutes of battery runtime at the initial startup. After a 24-hour charging period,
the UPS automatically runs a battery test and the correct battery runtime displays.
7.1
UPS Controls and Indicators
The controls and indicators identified and described in this section are used to control
and monitor UPS operation. Figure 7‐1 shows the controls and indicators.
Touchscreen
Control Panel
AC Input Breaker
CB1 (optional)
ISBM
ISBM
(Right Door
Removed)
Figure 7‐1. UPS Controls and Indicators
7.1.1
Control Panel
The control panel is used to set up and control the UPS, and to monitor UPS
operation. For a description of the UPS control panel functions, see paragraph 7.3.