Powering down/up applications (examples)
Servicing the Network Management Module – 171
4.3.2 Powering down non-priority equipment first
4.3.2.1 Target
Powering down non-priority equipment first (immediately) and keep battery power for critical equipment.
Powering down critical equipment 3min before the end of backup time.
4.3.2.2 Step 1: Installation setup
4.3.2.2.1 Objective
Use load segmentation provided by the UPS to independently control the power supply of each IT equipment categories
(Applications, Database servers, Storage).
Load segmentation also allows IT equipment to restart sequentially on utility recovery (
Содержание INDGW-X2
Страница 1: ...UPS Industrial Gateway Card INDGW X2 User s Guide English 10 18 2021 2 2 3 ...
Страница 23: ...Configuring Modbus Installing the Network Management Module 25 ...
Страница 24: ...Configuring Modbus Installing the Network Management Module 26 ...
Страница 25: ...Configuring Modbus Installing the Network Management Module 27 ...
Страница 26: ...Configuring Modbus Installing the Network Management Module 28 ...
Страница 35: ...Home Contextual help of the web interface 37 3 2 7 1 3 Battery mode 3 2 7 1 4 Off mode ...
Страница 37: ...Home Contextual help of the web interface 39 3 2 7 2 2 Bypass mode 3 2 7 2 3 Battery mode ...
Страница 61: ...Protection Contextual help of the web interface 63 Example 4 Custom ...
Страница 62: ...Protection Contextual help of the web interface 64 Settings 1 Settings 2 ...
Страница 218: ...Default settings and possible parameters Information 220 ...
Страница 266: ...Acronyms and abbreviations Information 268 ...
Страница 273: ......