![Eaton INDGW-X2 Скачать руководство пользователя страница 172](http://html.mh-extra.com/html/eaton/indgw-x2/indgw-x2_user-manual_525442172.webp)
Powering down/up applications (examples)
Servicing the Network Management Module – 174
Non-priority equipment immediately shuts down when on battery for 10s to keep battery power for critical equipment.
4.3.3 Restart sequentially the IT equipment on utility recovery
4.3.3.1 Target
Restart the storage first (right after utility recovery), database servers next (2min after utility recovery) and applications last (3min
after utility recovery).
4.3.3.2 Step 1: Installation setup
4.3.3.2.1 Objective
Use load segmentation provided by the UPS to independently control the power supply of each IT equipment categories
(Applications, Database servers, Storage).
Содержание INDGW-X2
Страница 1: ...UPS Industrial Gateway Card INDGW X2 User s Guide English 10 18 2021 2 2 3 ...
Страница 23: ...Configuring Modbus Installing the Network Management Module 25 ...
Страница 24: ...Configuring Modbus Installing the Network Management Module 26 ...
Страница 25: ...Configuring Modbus Installing the Network Management Module 27 ...
Страница 26: ...Configuring Modbus Installing the Network Management Module 28 ...
Страница 35: ...Home Contextual help of the web interface 37 3 2 7 1 3 Battery mode 3 2 7 1 4 Off mode ...
Страница 37: ...Home Contextual help of the web interface 39 3 2 7 2 2 Bypass mode 3 2 7 2 3 Battery mode ...
Страница 61: ...Protection Contextual help of the web interface 63 Example 4 Custom ...
Страница 62: ...Protection Contextual help of the web interface 64 Settings 1 Settings 2 ...
Страница 218: ...Default settings and possible parameters Information 220 ...
Страница 266: ...Acronyms and abbreviations Information 268 ...
Страница 273: ......