10
GREEN MOTION DC 22 EV CHARGER INSTALLATION MANUAL
MN192004EN November 2022 www.eaton.com
00 Title
4. Relevant information prior to the installation
4.1 Tools required for installation
Installation, commissioning, maintenance or retrofitting of the charging station must be performed by
professional and qualified personnel who are responsible for complying with existing standards and local
installation regulations.
The installation must be carried out only by professional and qualified personnel.
During the installation, ensure the equipment is powered off.
4.2 Package contents
To perform installation, professional and qualified personnel should have the following tools:
The Green Motion DC 22 box must contain the following parts:
•
Screwdriver (T20, TX30, PZ2),
•
Open-ended wrenches,
•
Drilling machine (depending on the mounting surface),
•
Laptop,
•
SIM card, in case of online chargers with 4G modem.
•
Green Motion DC 22 EV charger,
•
Quick start guide,
•
Safety guidelines,
•
EV cables(s), depending on customer configuration:
•
CCS plug, cable, plug holder,
•
CCS and CHAdeMO plugs, cables, plug holders,
•
Screws, cable glands and cable gland cap,
•
Wall-mount gaskets (four pieces).