background image

Technical Data

Page 9                    Effective: July 2003

PRC100 - Universal System Controller
& Enclosures

TD01412013E

                          For More Information Visit www.cutler-hammer.com

Pow-R-Command 100 Relay Cabinet

The Pow-R-Command 100 Relay Cabinet is
designed for circumstances where relays are
desired over Smart Breakers.  The Pow-R-
Command 100 Relay Cabinet is a self
contained enclosure designed to accommo-
date the necessary relays and Pow-R-
Command 100 controllers.  

Please note that

relays are sold separately of the Pow-R-
Command 100 Relay Cabinet.

Relay Cabinet Features

 • 

Cabinet Dimensions: 24-inches Wide, 30-

     inches High, & 5-inches Deep

 • 

NEMA Type 1 Enclosure Only

 • 

Space for 48 Relays

 • 

Integral 28V ac Control Power Transformer

 • 

Surface or Flush Mounted

 • 

UL 916 Listed

Relay Specification

As standard, Eaton’s Cutler-Hammer uses
Touchplate, or comparable, type relays.
Relay features include:

 • 

28V ac Latching Control Mechanism

 • 

20A 347V ac Max

 • 

Status Feedback Into Pow-R-Command

     100 System.

 • 

Single Pole Only

In addition to the Touchplate® relays, the
Pow-R-Command 100 Relay Cabinet can
control GE RR8 & RR9 relays.  This can be a
useful trait when retrofitting a facility which
already uses these types of relays.

Standard Relay Cabinet Components

The Pow-R-Command 100 Relay Cabinet
comes standard with a number of compo-
nents. These parts include the Cabinet,
Interior, Control Power Transformer, Relay
Termination Board, Relay Termination
Adaptor Board, and USC.

   Control Power

Both the Touchplate relays and the Pow-R-
Command 100 controllers require 28V ac for
operation.  Each Pow-R-Command 100
Relay Cabinet is complete with a dual tap
control power transformer that can be used
in both 120V ac and 277V ac applications.
Fusing is provided on the primary side of the
transformer and a switch with thermo
magnetic protection is provided on the
secondary side of the transformer.  28V ac
is transferred to all devices (relays and Pow-
R-Command 100 devices) through the
Relay Termination Board.

Relay Termination Board

The Relay Termination Board is a large
printed circuit board that stretches the width
and length of the interior of the Pow-R-
Command 100 Relay Cabinet.  The Relay
Termination Board provides a connection
point for up to three Pow-R-Command 100
controllers, connection point for up to 48
relays, terminations for up to 48 two-wire
switch inputs, connection to the Pow-R-
Command 100 network, and acts as a
control power bus to all devices attached to
it.

Application Specific Controller Ports

Located on the Relay Termination Board are
three (3) sets of white connection ports.
These connection ports are used to attach
the controllers installed in the Pow-R-
Command 100 Relay Cabinet.  The first two
sets of ports are used to connect the Relay
Termination Adaptor Board, the last set is
used to connect a Switch Override
Controller only.  See 

Technical Document

1412011E 

for more information on the

Switch Override Controller.

Relay Termination Adaptor Board

The Relay Termination Adaptor Board is
used to make more efficient use of space
when mounting a USC and/or Pow-R-
Command 100 Network Access Device into

a Pow-R-Command 100 Relay Cabinet.
The Relay Termination Adaptor Board
attaches to the Relay Termination Board on
the first two sets of Pow-R-Command
controller ports. The Relay Termination
Adaptor Board rotates the first two sets of
application specific controller ports  90
degrees so the USC and applicable Pow-R-
Command 100 Network Access Device can
be vertically mounted.

Relay Termination Points

Located along each side of the Relay
Termination Board are 24 four-pin connec-
tion points suited for the connector found on
a Touchplate Relay.  Each connection point
is numbered.  When using a GE RR8 or
RR9 relay a special connector must be
attached to the control wires from the relay
in order for it to be attached to the relay
termination ports.

Switch Input Terminations

Located at the bottom of the Relay
Termination Board are three rows of screw
terminations.  These termination points are
used to attach up to 48 two-wire switch
inputs to the Pow-R-Command 100 Relay
Cabinet.  In order for a switch input wired to
these termination points to be recognized, a
Switch Override Controller must be used.
See 

Technical Document TD01412011E

for more information on wiring to and using
these termination points.

Optional Relay Cabinet Components

Two optional components that can be
purchased separately and mounted integral
to the Relay Cabinet.  These two items are
the Pow-R-Command 100 Switch Override
Controller and the Universal Modem
interface

Switch Override Controller

The Switch Override Controller is a Pow-R-
Command 100 controller.  Its basic function
is to provide processing of addition inputs
into the Pow-R-Command 100 system.  A
Switch Override Controller is commonly
used when more then 12 inputs need to be
wired to a panel. For more information on
the Switch Override Controller, see

Technical Document TD1412011E

.

Figure 8: Pow-R-Command 100

Relay Cabinet

Содержание Cuttler-Hammer Pow-R-Command 100

Страница 1: ...uts 3 USC Input Output Specification 3 Integrated Timing Scheduling Features 3 Grouping Devices 3 Control Command Functions 3 On Board Indicator LED s 4 Networking Controllers 4 Locally Accessing A US...

Страница 2: ...he capabilities offered by the Pow R Command 100 controller the system would not have a great deal of use without enclosures Currently there are five general type of enclosures used in the Pow R Comma...

Страница 3: ...o use a master clock function in order to assure coordination of all USC s on a network The master clock is found on the Network Access Device For further information on Network Access Devices see Tec...

Страница 4: ...the Pow R Command 100 software installed For more information on using PC s with the Pow R Command 100 network see Technical Document TD01412016E For more information on the types of Pow R Command 10...

Страница 5: ...Thermostats may also be connected to analog inputs outputs Figure 4 Analog Output Wiring Common Analog Output 1 Analog Output 2 Black White Red Power Dimming Pigtail Red Black Universal System Contro...

Страница 6: ...t network The maximum distance of the Pow R Command 100 network is 4 000 Feet from the Network Access Device to the furthest controller on the network using a shielded twisted pair network cable SHLD...

Страница 7: ...ocally terminate the Pow R Command 100 network Breaker Termination Boards The Breaker Termination Boards are a control bus that runs underneath the load side terminals of the branch circuit breakers o...

Страница 8: ...BR BABRS BAB GHQRS 3 4 GHBS GHB BABR BABRS BAB GHQRS 3 4 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 13X PRC100 Smart Chassis 18 Single Pole Spaces for GHBS GHB BABR BABRS BAB GHQ...

Страница 9: ...s a control power bus to all devices attached to it Application Specific Controller Ports Located on the Relay Termination Board are three 3 sets of white connection ports These connection ports are u...

Страница 10: ...R Command 100 Control Cabinet is sold complete with all of the standard components of the Pow R Command 100 Relay Cabinet with the exception of the USC In addition the Pow R Command 100 Control Cabin...

Страница 11: ...former capable of operating at either 120 V ac or 277V ac Power to the trans former is drawn directly from the bus Additionally line protection is supplied to both the primary and secondary side of th...

Страница 12: ...Data Page 12 Effective July 2003 PRC100 Universal System Controller Enclosures TD01412013E For More Information Visit www cutler hammer com Panelboard T ypes M ain Breaker T ypes M ounting H Horizonta...

Страница 13: ...ox Pull box is furnished without knockouts Standard Dimensions 12 inches 304 8 mm high 16 inches 406 4 mm wide 6 inches 152 4 mm deep Panelboard T ypes M ain Breaker T ypes M ounting H Horizontal V V...

Страница 14: ...e mounted in a single section it must have a main device amperage rating of 250A or less for main lugs or 100A or less for main breaker A Pow R Command 100 Panelboard intended to mount in a cell of an...

Страница 15: ...TD01412015E PRC100 Human Machine Interfaces TD01412016E PRC100 JCI 100 Controller TD01412017E PRC100 Protocol Exchanges TD01412018E PRC100 0 10V dc Dimming Electronic Ballasts Control TD01412019E PRC...

Отзывы: