background image

14

5.4  Connection Battery nLLK 15 LED N 
1/6

The battery is cut of for delivering. Connect the 
battery before taking into operation.

Open the second reflector flap. (fig. 3)

fasten unplugged battery wire. (fig. 4-6) 
securely onto the connector.

Observe the polarity of the Battery. (fig 5)

5.5  Connection Battery  
 

nLLK 15 LED N   2/6

The battery is cut of for delivering. Connect the 
battery before taking into operation:

 Open the light fitting protective bowl 

before opening the battery compartment.  
This interrupts the emergency lighting circuit.

Unscrew the battery compartment cover 
(fig. 14).

Connect cables on the connectors.

Close battery-box in reverse order.

5.6  Fitting the lamps

 Only use LED tubes that have been 

certified for these light fittings, see Technical 
data and type label! 

The LED tubes (G5) is to be inserted to its stop 
into the marked holders so that both pins on 
either side of the lamp engage in the holder. 
Only the holders on this side are wired with 
connecting wires.

Insert the cable entries of the LED - tubes into 
the socket use it in an opposite side.

The lamp is to be inserted to its stop into both 
holders, so that both pins on either side of the 
lamp engage in the holder.

Then turn the lamp to its  lock-in position, see 
fig. 22 and fig. 23.

If the LED tubes are inserted with swapped 
ends, there is no function.

Observe the emission direction of the LED 
tubes.

 Lamp exchange must be carried out while 

energy is switched off. 
Option:  
Variation with double-pole switch:
Automatic cut off with double-pole switch 
while opening the protective bowl.

6.  Taking into operation

-   Prior to operation, check the light fitting for 

its proper functioning and installation in 
compliance with these operating instructions 
and other applicable regulations!

Only carry out insulation measurements 
between PE and the external conductor 
L1(L,L2,L3) as well as between PE and N! 
- measuring voltage:   max. 1 kV AC/DC 
- measuring current:   max. 10 mA

Only operate the light fitting with complete 
closed protective bowl.

The battery is not complete full charged in 
delivery condition.

To balancing the LED display to the battery 
capacity, the battery have to be  charged 14 
h before the first operation.

After that, release a function test of the 
emergency light connection, see 7.1.1. 
Maintenance, function test.

7. Function

7.1 

Emergency operation

The duration of the emergency operation is 
factory side fixed and can not be adjusted.

The emergency operation will automatically 
stated when mains supply failed or the charging 
line L is switched off. The green marked 
emergency lamp will operate on battery mode.

7.1.1  Function test emergency light

Switch off the mains supply from light fitting.

The emergency lamp will operate.

A function test should not exceed the following 

test periods:

Battery set for 1,5 h emergency light:   60 min.
Battery set for 3,0 h emergency light: 120 min.

Should the emergency lamp be extinguished 
within the test period though the battery is fully 
charged, the latter will have to be replaced by a 
new battery set.

7.2 Charging

At temperatures below  -5°C and above +35°C 
the battery will not be fully charged for 
electrochemical reasons.

Note: New batteries will reach their total useful 
capacity only after 3 charging/discharging cycles.

8.   Maintenance

Observe the national regulations 

applicable to the   maintenance, servicing and 
test of electrical apparatus as well as the 
general rules of engineering  
(e.g. IEC/EN 60079-17, IEC/EN 60079-19)!

8.1 Servicing

When servicing, in particular those components 
that affect the type of protection, will have to be 
checked, e.g.: 

-   Housing and protective bowl for any cracks 

or damages.

-   Gaskets for their perfect condition. 

-   Terminals and blanking plugs for their firm fit.

Because of the risk of an electrostatic 

charge, the light fitting shall only be cleaned 
with a damp cloth or sponge!  
Only use customary household washing-up 
liquid diluted in water as specified! The water 
temperature may be max. 50ºC. After that, 
rinse with clear water to prevent the risk of  
tension cracks in the protective bowl!

Lamp replacement: Keep replacement intervals 
as specified by the lamp manufacturer!

9. Repair

Prior to replacing or removing any 

components, observe the following: 
Disconnect the power supply to the equip-
ment before maintenance / repair. 
Disconnect the power supply to the equip-
ment before maintenance / repair.  
Only use certified genuine CCH / EATON spare 
parts! (See CCH / EATON spare parts list).

Lamp exchange must be carried out while 

energy is switched off. 

Option:  
Variation with double-pole switch:
Automatic cut off with double-pole switch 
while opening the protective bowl.
9.1  Battery change general

 Transport the battery only in original 

packing through potentially  zones 2/22  with 
explosive atmospheres. 
Protect against shocks.

Prior to opening the enclosure, it is necessary 
to ensure that the voltage supply has been 
isolated.

Only use certified genuine CCH / EATON 
spare parts.

Explosion protected light fittings zone 2 and zone 22  
Series: nLLK 15 LED N

GB

Содержание Crouse-Hinds nLLK 15 LED N Series

Страница 1: ...tleuchten f r Zone 2 und Zone 22 Serie nLLK 15 LED N Explosion protected emergency light fittings for zone 2 and zone 22 Series nLLK 15 LED N Betriebsanleitung Operating instructions CROUSE HINDS SERI...

Страница 2: ...rtung 11 1 Safety instructions 12 2 Technical data 12 3 Conformity with standards 13 4 Special functional features 13 5 Installation 13 6 Taking into operation 14 7 Function 14 8 Maintenance 14 9 Repa...

Страница 3: ...zit t erreicht Durch eine berdimensionierung der Batte rie Kapazit t erreicht eine neue Batterie auch mit diesen 90 Nennkapazit t die eingestellte Notlicht Nennbetriebsdauervon 90 min bzw 180 min Bei...

Страница 4: ...ed approx 90 of its rated capacity As the capacity of the battery is over specified this 90 will be sufficient to provide a rated discharge for both a 90 minute and 180 minute setting Initial charging...

Страница 5: ...m Illustrations for mounting type nLLK 15 LED N 1 2 2 4 732 600 1332 1200 Sechskant Hexagon SW 13 400 600 700 1200 760 600 1360 1200 M8 12mm tief deep profond 46 188 65 130 D GB L N L PE L 1 PE N LED...

Страница 6: ...ntagebilder Typ nLLK 15 LED N 600 nLLK 015 LED N 1200 Wiring diagram Illustrations for mounting type nLLK 15 LED N 600 nLLK 015 LED N 1200 M8 14 mm tief deep profond 188 46 12 13 14 15 16 D GB L N L P...

Страница 7: ...without 1 6 mit with 2 6 nLLK 15 LED N interne Batterie internal Battery 4 Ah 600 X VE EVG 350 mA 220 240 V AC 50 60 Hz 1 5 h D II 3G D II 3D Ex db ec IICT4 Gc Ex tc IIICT80 C Dc 2 22 25 C 55 C 1200 X...

Страница 8: ...h EN IEC 60529 IP 66 Schutzklasse nach EN IEC 61140 I zul ssige Umgebungstemperatur 1 sieheTabelle 1 Lagertemperatur in der Originalverpackung 25 C bis 55 C Klemmverm gen Steck Anschlu ssklemme 2 x 2...

Страница 9: ...charnierbar Schutzwanne zum Verschlie en der Leuchte fest an das Leuchtengeh use andr cken und den Zentralverschluss um 90 drehen 5 2 Montageabmessungen siehe Bild 2 und 10 Beachten Sie beim Befestige...

Страница 10: ...ge ndert werden Notlichtbetrieb wird automatisch durch einen Netzausfall oder manuell durch Abschalten der Ladespannung L eingeleitet Hierbei wird die gr ne gekennzeichnete Notlichtlampe auf Batterie...

Страница 11: ...en Bild 14 Halterung abnehmen und Akkus herausneh men Bild 15 Batterie Bild 16 in umgekehrter Reihenfolge wieder einbauen 9 2 Inbetriebnahme nach Batteriewechsel Nach dem die Batterie gewechselt wurde...

Страница 12: ...on acc to IEC EN 60529 IP 66 Insulation class to IEC EN 61140 I max permissible ambient temperature 1 see table 1 Storage temperature in original packing 25 C to 55 C Supply terminal clamping capacity...

Страница 13: ...n at option be hinged on either side To close the light fitting press the protective bowl tightly onto the luminaire housing and turn the central locking device through 90 5 2 Mounting dimensions see...

Страница 14: ...t be adjusted The emergency operation will automatically stated when mains supply failed or the charging line L is switched off The green marked emergency lamp will operate on battery mode 7 1 1 Funct...

Страница 15: ...tery change nLLK 15 LED N 2 6 Open the light fitting protective bowl before opening the battery compartment This interrupts the emergency lighting circuit Cover of the battery box unscrew with an Alle...

Страница 16: ...nds CEAG atstovyb je savo alyje LV o ekspluat cijas instrukciju valsts valod varat piepras t j su valsts atbild gaj Cooper Crouse Hinds CEAG p rst vniec b M Jistg u jitolbu dan il manwal fil lingwa na...

Отзывы: