4

Important notes  
for battery handling

GB

B3.2  Charging during operation

The charging current is engineered in such a way 
that a discharged battery will have within 14 h 
approx. 90% and within 20 h approx. 100% of its 
capacity.

In emergency operation the battery voltage is 
monitored via a deep discharge protection which 
prevents a deep discharge of the cells.

The microprocessor controls and recharges any 
reduction of capacity due to self-discharge in 
normal operation.

It is recommended to have one or two fully 
discharges per year. This increases the usable life 
time of the battery.

Should this not be possible due to logistic and 
safety reasons at least a partial discharge of a 
minimum of 40 minutes or 2 hours depending on 
the setting, is recommended.

B3.3  Charging after storage

After a long storage of the batteries a full 
uninterrupted charge for 20 h should  be applied 
followed by a full discharge down to deep 
discharge protection (emergency lamp off). 

If the capacity indication does not show 5 green 
LEDs fully lit after 14 h, the above process 
should be repeated. In order to reach full battery 
capacity after longer storage, it is recommended  
to have 3 charging/discharging cycles.

B3.   Charging

B3.1  Initial Charging 

Battery charging starts when the power is 
switched on. On the connection of a new battery 
the indication of the charge state may be delayed 
by a few minutes. The first green LED might take 
a few minutes to start flashing. 

After a charging period of 14 hours the battery 
will have reached approx. 90% of its rated 
capacity. As the capacity of the battery is over 
specified, this 90% will be sufficient to provide  
a rated discharge for both a 90 minute and  
180 minute setting.

Initial charging at 0 °C ambient temperature 
might  take double the time than at tempera-
tures of >10 °C.

After first mains connection an uninterrupted 
charging time of 20 hours is recommended to 
avoid early ageing due to power-on power-off 
situations. The battery set is only partially 
charged when supplied.

Multiple switching (on - off) of the mains circuit 
should be avoided before a first initial charge 
(recommended 20h, minimum 14h) is 
achieved. Such interruptions can significantly 
reduce the lifetime of the battery.

Recommendation: New batteries will reach the 

full utilisable capacity after approx. 3 charging / 

discharging cycles. 

B1.   Safety instructions

 Target group: 

or skilled electricians and suitable qualified, 
instructed personnel in accordance with 
national legislation, including the relevant 
standards and, where applicable, in acc. with  
IEC/EN 60079-17 on electrical apparatus for 
explosive atmospheres.

The battery must not be operated in zone 0 

or zone 20 hazardous areas!

B2.    General information about  

the charging technology

The microcomputer controlled charging system 
measures the charging and discharging current 
and transmits it to a capacity meter. Five green 
light emitting diodes indicate in 20%-steps the 
actual charge state of the battery.

Overcharging is prevented by means of this 
charging control dependent on the capacity.  
Only the energy drawn is recharged. The 
so-called memory effect is thus also prevented. 

For electrochemical reasons charging and the 
capacity are influenced at temperatures below  
-5 °C and above +35 °C. 

At temperatures below -5 °C and above +35 °C 
charging will take a longer time and full charging 
is not guaranteed.

Содержание Crouse-Hinds nLLK 08 N Series

Страница 1: ...otleuchten für Zone 2 und Zone 21 22 Serie nLLK 08 N Explosion protected emergency light fittings for zone 2 and zone 21 22 Series nLLK 08 N Betriebsanleitung Operating instructions CROUSE HINDS SERIES 3 3465 000 167 D GB K ...

Страница 2: ...ertung 11 1 Safety instructions 12 2 Technical data 12 3 Conformity with standards 13 4 Special functional features 13 5 Installation 13 6 Taking into operation 14 7 Function 14 8 Maintenance 14 9 Repair 14 10 Disposal Recycling 15 Inhalt Contents B1 B3 Wichtige Hinweise zur Handhabung der Batterie 3 Schaltplan Montagebilder 5 B1 B3 Important notes for battery handling 4 Wiring diagram Illustratio...

Страница 3: ...rung der Batte rie Kapazität erreicht eine neue Batterie auch mit diesen 90 Nennkapazität die eingestellte Notlicht Nennbetriebsdauervon 90 min bzw 180 min Bei einer Umgebungstemperatur von ca 0 C benötigt die Erstladung der Batterie in etwa die doppelte Zeit gegenüber einer Ladung bei über 10 C Bei der Erstinbetriebnahme empfiehlt sich eine ununterbrochene Ladezeit von 20 h Hierdurch wird eine vo...

Страница 4: ...attery is over specified this 90 will be sufficient to provide a rated discharge for both a 90 minute and 180 minute setting Initial charging at 0 C ambient temperature might take double the time than at tempera tures of 10 C After first mains connection an uninterrupted charging time of 20 hours is recommended to avoid early ageing due to power on power off situations The battery set is only part...

Страница 5: ...tions for mounting type nLLK 08 N 1 6 1 2 2 4 732 18W 1332 36W Sechskant Hexagon SW 13 400 18W 700 36W 760 18W 1360 36W M8 12mm tief deep profond 46 188 65 130 L L1 L2 L3 N PE L N L LED LED BAT BAT LA1 LA2 LA3 LA4 LA5 LA6 LA7 LA8 Lampe 2 Netzlampe Lampe 1 Netz und Notlampe VE EVG D GB ...

Страница 6: ... BAT LA1 LA2 LA3 LA4 LA5 LA6 LA7 LA8 700 36W 400 18W 130 Sechskant Hexagon SW 13 900 18W 1500 36W 65 11 10 9 Schaltplan Montagebilder Typ nLLK 08018 18 N 2 6 nLLK 08036 36 N 2 6 Wiring diagram Illustrations for mounting type nLLK 08018 18 N 2 6 nLLK 08036 36 N 2 6 L L1 L2 L3 N PE M8 14 mm tief deep profond 188 46 12 13 14 15 16 D GB ...

Страница 7: ... Dc Ex tb IIICT80 C Db 2 22 21 25 C 45 C 2 x 36W X VE EVG 2 x 36W 220 240 V AC 50 60 Hz 1 5 h D II 3G D II 3D D II 2D Ex nA eb db eb IICT4 Gc Ex tc IIICT80 C Dc Ex tb IIICT80 C Db 2 22 21 25 C 45 C nLLK 08 N externe Battery external Battery 4 Ah 2 x 18W X VE EVG 2 x 18W 220 240 V AC 50 60 Hz 1 5 h D II 3G D II 3D D II 2D Ex nA eb db eb IICT4 Gc Ex tc IIICT80 C Dc Ex tb IIICT80 C Db 2 22 21 25 C 45...

Страница 8: ...ehe Tabelle 1 Db Bemessungsspannung sieheTabelle 1 cos ϕ 0 95 cap Lampenbestückung Leuchtstofflampen mit Zweistiftsockel G13 nach 18W IEC 60081 2220 36W IEC 60081 2420 Schutzart nach EN IEC 60529 IP 66 Schutzklasse nach EN IEC 61140 I zulässige Umgebungstemperatur 1 sieheTabelle 1 Lagertemperatur in der Originalverpackung 25 C bis 45 C Klemmvermögen Steck Anschlu ssklemme 2 x 2 5 mm Klemmvermögen ...

Страница 9: ...ierbar Schutzwanne zum Verschließen der Leuchte fest an das Leuchtengehäuse andrücken und den Zentralverschluss um 90º drehen 5 2 Montageabmessungen siehe Bild 2 und 10 Beachten Sie beim Befestigen des Montagezu behörs an der Leuchte die max Gewindetiefe der Montagebohrung von 14 mm Verwenden Sie keine zu langen Schrauben Zeigt der Lichtaustritt nach oben sind zusätzliche Schutzmaßnahmen gegen dau...

Страница 10: ...trieb umgeschaltet 7 1 1 Funktionstest Notlicht Netzspannung der Leuchte ausschalten Die Notlichtlampe Fassung mit grüner Markierung muss leuchten Folgende Prüfzeiten sollten bei einem Funktions test nicht überschritten werden das sonst keine Notlichtreserve zur Verfügung steht Batteriesatz mit 1 5 h Notlicht 60 min Batteriesatz mit 3 0 h Notlicht 120 min Erlischt die Notlichtlampe bei vollgeladen...

Страница 11: ...g LED blinkt Fehler im Lampenkreis z B EOL Abschaltung Beide Lampen sind außer Betrieb Notlichtfunktion ist deaktiviert Fehlerbehebung Lampenwechsel Nach der Fehlerbehebung muss die Leuchte durch Abschalten des Ladestromkreises zurückgesetzt werden Ersatzteile Leuchte EVG Typ Identnummer nLLK 08 N 2x 18W 4 Ah VE EVG 2x18W 230 V 50 60 Hz 3 h kompl verpackt 2 2804 218 601 nLLK 08 N 2x 18W 4 Ah VE EV...

Страница 12: ...plication Zone 21 Ex tb see table 1 Db Rated voltage see table 1 cos ϕ 0 95 cap Lamps to be fitted Fluorescent lamps with G13 bi pin cap to 18W IEC EN 60081 2220 36W IEC EN 60081 2420 Protection acc to IEC EN 60529 IP 66 Insulation class to IEC EN 61140 I max permissible ambient temperature 1 see table 1 Storage temperature in original packing 25 C to 45 C Supply terminal clamping capacity per cla...

Страница 13: ...e bowl can at option be hinged on either side To close the light fitting press the protective bowl tightly onto the luminaire housing and turn the central locking device through 90 5 2 Mounting dimensions see fig 2 and 10 When fixing the mounting accessories onto the light fitting observe the max depth of thread of 14 mm Do not use too long screws Installing the light output upwards additional pro...

Страница 14: ...ery mode 7 1 1 Function test emergency light Switch off the mains supply from light fitting The green marked emergency lamp will operate A function test should not exceed the following test periods Battery set for 1 5 h emergency light 60 min Battery set for 3 0 h emergency light 120 min Should the emergency lamp be extinguished within the test period though the battery is fully charged the latter...

Страница 15: ...e nLLK 08 N 2 x 18W 1 6 Battery 6 V 4 Ah 1 5 and 3 h compl packed 2 3468 236 902 nLLK 08 N 2 x 36W 1 6 Battery 6 V 4 Ah 1 5h compl packed 2 3468 236 902 nLLK 08 N 2 x 18W 2 6 Battery 6 V 4 Ah 1 5 and 3 h compl packed 2 3468 236 903 nLLK 08 N 2 x 36W 2 6 Battery 6 V 4 Ah 1 5h compl packed 2 3468 236 903 nLLK 08 N 2 x 36W 2 6 Battery 6 V 7 Ah 3 h compl packed 2 3468 236 904 9 1 2 Battery change nLLK...

Страница 16: ...16 ...

Страница 17: ...17 ...

Страница 18: ...18 Notizen Notes ...

Страница 19: ...19 Notizen Notes ...

Страница 20: ...ciju valsts valod varat piepras t j su valsts atbild gaj Cooper Crouse Hinds CEAG p rst vniec b M Jistg u jitolbu dan il manwal fil lingwa nazzjonali tag hom ming and ir rappre entant ta Cooper Crouse Hinds CEAG f pajji hom NL Indien noodzakelijk kan de vertaling van deze gebruiksinstructie in een andere EU taal worden opgevraagd bij Uw Cooper Crouse Hinds CEAG vertegenwoordiging P Se for necessár...

Отзывы: