Bushing removal and replacement

1.  Verify that tank is grounded. De-energize transformer 

from a remote upstream source. Ground all bushings 

and terminals before performing maintenance on 

bushings.

2.  Open tank by removing tank cover or manhole/ 

handhole cover as outlined in 

Tank Cover Removal 

and Installation

 section of this manual.

3.  Lower insulating liquid level as outlined in 

Insulating 

Liquid Maintenance

 section of this manual. Lower liq-

uid level to completely expose the bushing.

4.  Disconnect all internal and external cable and leads. 

Note position of all nuts, flat washers, spring washers, 

etc., so they can be re-installed in same locations.

5.  Remove all bushing clamp hardware, noting position of 

all nuts, flat washers, spring washers, etc., so they can 

be re-installed in same locations.

6.  Remove external bushing clamp, bushing, and gasket.
7.  Install a new bushing and gasket. Center bushing 

and gasket to obtain an effective seal. Install exterior 

bushing clamp and clamp hardware. Tighten clamp nuts 

per torque specified in Table 1.

8.  Re-connect all external and internal cables and leads. 

Replace all nuts, flat washers, spring washers, etc., in 

their original position. Tighten all connections per torque 

specified in Table 1.

9.  Restore insulating liquid to appropriate level as outlined 

in 

Insulating Liquid Maintenance

 section of this 

manual. Close, reseal, and leak test tank as outlined 

in the Tank Cover Removal and Installation section of 

this manual. Inspect bushing-to-tank seal for leaks or 

seepage.

Cabinet removal and installation

Cabinet removal

1.  Verify that tank is grounded. De-energize transformer 

from a remote upstream source. Ground all bushings and 

terminals before performing maintenance on cabinet.

2.  Place one 1/4 to 3/8 inch shim directly below faceplate 

on both sides of tank at points A and A’ (see Figure 28).

3.  Place one 1 1/2 inch wedge under each side of cabinet 

at points B and B’ to relieve strain on the cabinet.

4.  Note position and orientation of gasket that is between 

top of cabinet and tank so it can be re-installed in same 

fashion.

5.  Disconnect HV-LV barrier from vertical bracket of face-

plate.

Bushing Clamps
Clamp Type

Hardware Tightening Torque

Cast Aluminum Clamp

70-80 in-lbs.

Molded Polymer Tri-Clamp 

40-60 in-lbs.

All other 3 & 4 hole Clamps

40-60 in-lbs.

Table 1.  Bushing  Hardware Tightening Torque

Bushings With Internal Spade Connections
Bushing Hardware

Hardware Tightening Torque

1/2” Steel (Grade 8)

50 ft-lbs.

3/8” Steel (Grade 8)

50 ft-lbs.

Bushings With Internal Stud Connections
Bushing Hardware

Hardware Tightening Torque

3/8”-16 Brass Nuts

16 ft-lbs.

5/8”-11 Aluminum Nuts

60 ft-lbs.

5/8”-11 Brass Nuts

75 ft-lbs.

1”-14 Brass Nuts

121 ft-lbs.

Bushing Lead Block,  

1/2” Steel Hardware

110 ft-lbs.

Right  

Side  

of  

Cabinet

Left 
Side  
of  
Tank

Front of Cabinet

Right 

Side  

of  

Tank

A     B           A B  

                       A’ B’           B’     A’

Left 
Side of 
Cabinet

Shim

1 1/2 inch

1/4 to 3/8 inch

Wedge

Figure 28.  Cabinet removal diagram.

CAUTION 

Potential Falling Object. Can cause personal injury or 

damage to transformer. Do not open cabinet doors 

when cabinet is removed from transformer tank. 

Opening cabinet doors will cause cabinet to fall 

forward.

WARNING

Hazardous voltage. Can cause severe injury, death, or 

damage to equipment. De-energize transformer from 

a remote upstream source before opening cabinet 

and doing cabinet interior inspection or maintenance. 

Check that all transformer terminals and bushings have 

zero voltage. Ground transformer following industry 

accepted safe grounding practices.

22

Three-phase pad-mounted compartmental type installation and maintenance instructions

   MN202001EN   August 2015

Содержание COOPER POWER SERIES

Страница 1: ...ER POWER SERIES Distribution Transformers MN202001EN Effective August 2015 Supersedes S210 12 1 August 2013 Three phase pad mounted compartmental type transformer installation and maintenance instruct...

Страница 2: ...NTRACT BETWEEN THE PARTIES ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON THE CONTENTS OF THIS DOCUMENT SHALL NOT BECOME PART OF OR MODIFY ANY CONTRACT BETWEEN THE PARTIES In no event will Ea...

Страница 3: ...Loadbreak Switches 11 Tap Changer 12 Dual Voltage and Delta Wye Switch 14 Vacuum Fault Interrupter VFI 15 Air Switches Arc Strangler 16 Surge Arresters 17 MAINTENANCE Exterior Maintenance 19 Cabinet I...

Страница 4: ...ions when working around high voltage lines and equipment and support our Safety For Life mission Safety information DANGER Hazardous voltage Contact with hazardous voltage will cause death or severe...

Страница 5: ...er capacity When using a forklift lift with the transformer tank closest to the mast of the forklift since most of the transformer weight is in the tank Pallet mounted equipment may also be moved by c...

Страница 6: ...abinet the installation will not provide the security needed to prevent tampering by the public Add a permanent mortar seal to fill the gaps Pre service inspection exterior New transformers or transfo...

Страница 7: ...e on underside of the tank cover or man hole cover 2 Loose shifted or damaged parts bushings fuse holders etc 3 Broken or loose connections 4 Contaminated insulating liquid sediment or foreign objects...

Страница 8: ...ransformer nameplate Transformer neutrals must be connected to system neutrals Leads and connections that are not used must be insulated from ground and all other leads Livefront transformer connectio...

Страница 9: ...furnished with the transformer Liquid temperature gauge Transformers may be furnished with a temperature gauge as optional equipment to indicate the top liquid temperature in the tank in degrees Cels...

Страница 10: ...sformer Pressure relief device Transformers may have a cover mounted pressure relief device PRD in addition to the faceplate mounted pressure relief valve PRV standard on all three phase pad mounted d...

Страница 11: ...minals following industry accepted safe grounding practices Grounding secondary terminals protects against situations such as a standby generator energizing transformer from the secondary circuit Foll...

Страница 12: ...valve to open valve Hold the valve open for 30 seconds after pressurized air can no longer be heard hissing through the valve 2 Close pressure relief valve and wait 30 seconds 3 Pull pressure relief...

Страница 13: ...from fuse cartridge 1 Use 3 4 inch and 1 2 inch wrenches to remove end plug see Figure 13 2 Use screwdriver or other tool to straighten tulip tip end of fuse link and push fuse link out of fuse cartri...

Страница 14: ...facturer s product literature for maximum interrupting ratings Internal cartridge fuse replacement 1 Verify that tank is grounded De energize transformer from a remote upstream source Ground all bushi...

Страница 15: ...n cause an explosion or fire Use a hotstick to operate transformer loadbreak equipment After operating transformer loadbreak equipment check that voltages at transformer terminals are the expected val...

Страница 16: ...clockwise to loop thru transformer open The transformer is now OPEN and the loop conductor is electrically connected 3 Move index plate between loop thru transformer open and line b only 4 Rotate swit...

Страница 17: ...e handle to desired position and allow pointer to drop into slot of index plate 5 Secure handle in its new position by tightening lock screw through index plate until it bottoms 6 Padlocking may be ac...

Страница 18: ...position as follows 1 Verify that tank is grounded De energize transformer from a remote upstream source Ground all bushings and terminals before operating dual voltage or delta wye switch 2 Back out...

Страница 19: ...Do not operate loadbreak equipment if a fault condition is suspected Doing so can cause an explosion or fire Use a hotstick to operate transformer loadbreak equipment After operating transformer load...

Страница 20: ...erly and that electrical circuit conditions are as expected Before servicing transformer secondary connected equipment verify that all transformer secondary terminals have zero voltage and ground the...

Страница 21: ...blished maximum continuous operating voltage MCOV values The transformer should not be tested impulse or applied potential with the arrester connected If connected during impulse tests the arrester wi...

Страница 22: ...by rotating handle 3 4 to 1 turn after handle has come in contact with seal gland Under oil arrester disconnection during test with out arrester disconnect switch To disconnect arresters without a dis...

Страница 23: ...nt dirt or moisture from entering the opened transformer tank Contamination of the insulating liquid will prevent the transformer from operating properly and may cause serious damage to the transforme...

Страница 24: ...aks Test pressure should not exceed 7 psig Established pressure should be main tained for at least four hours to insure that all seals are proper 4 Re install the nutguard using 25 ft lbs torque to ti...

Страница 25: ...t cover weld 10 Thoroughly clean tank cover to help prevent contamination of insulating liquid when removing cover Remove all dirt grease and moisture 11 Remove tank cover from tank Weld on tank cover...

Страница 26: ...ntenance on cabinet 2 Place one 1 4 to 3 8 inch shim directly below faceplate on both sides of tank at points A and A see Figure 28 3 Place one 1 1 2 inch wedge under each side of cabinet at points B...

Страница 27: ...nventional transformer oil mixed with R Temp fluid Conventional transformer oil content of 3 in R Temp fluid lowers the fire point below 300 C Measure the ASTM flash and fire points if the presence of...

Страница 28: ...uld be clean and dry large mouth glass bottles Make sure that the liquid being sampled is representative of the liquid in the unit Sufficient liquid must first be drawn off to ensure that the sample w...

Страница 29: ...y Cleveland Open Cup 2 ASTM D877 Standard Test Method for Dielectric Breakdown Voltage of Insulating Liquids Using Disk Electrodes 3 ASTM D923 Standard Practices for Sampling Electrical Insulating Liq...

Страница 30: ...reported and investigated Annual Cabinet Interior Maintenance Items to Inspect Points to be checked Remedial Action Frequency Gauges and Controls Check for proper operation Repair or replace damaged o...

Страница 31: ...g will achieve a rainbow coloring if a particular terminal is experiencing an over temperature condition Tighten any loose connections immediately Any damage or discoloration that is observed should b...

Страница 32: ...on com cooperpowerseries 2015 Eaton All Rights Reserved Printed in USA Publication No MN202001EN August 2015 For Eaton s Cooper Power series three phase pad mounted transformer product information cal...

Отзывы: