UPS System Installation
Eaton 9E UPS (20–30 kVA, 208/220V) Generation 3 Installation and Operation Manual P-164000301—Rev 1
www.eaton.com/powerquality
4-27
Installation Checklist
o
All packing materials and restraints have been removed from each cabinet.
o
The UPS cabinet is placed in its installed location
o
All conduits and cables are properly routed to the UPS and any ancillary cabinets.
o
All power cables are properly sized and terminated.
o
Neutral conductors are installed.
o
A ground conductor is properly installed.
o
Building alarms are wired appropriately. (Optional)
o
LAN drops are installed. (Optional)
o
LAN connections have been completed. (Optional)
o
The REPO device is mounted in its installed location and its wiring is terminated inside the
UPS cabinet. (Optional)
o
A jumper wire is connected between pins 3 and 4 on the REPO terminal block if using a normally-closed
REPO switch. (Optional)
o
Internal battery strings are connected after all other wiring is complete.
o
All terminal cover plates are installed.
o
Accessories are mounted in installed locations and wiring is terminated inside the UPS cabinet. (Optional)
o
Air conditioning equipment is installed and operating correctly.
o
The area around the installed UPS system is clean and dust-free. (Eaton recommends that the UPS be
installed on a level floor suitable for computer or electronic equipment.)
o
Adequate workspace exists around the UPS and other cabinets.
o
Adequate lighting is provided around all UPS equipment.
o
A 120 Vac service outlet is located within 7.5 meters (25 feet) of the UPS equipment.
o
Startup and operational checks are performed by an authorized Eaton Customer Service Engineer for
installations with accessory cabinets.
Parallel System Installation Checklist
o
Each cabinet in the parallel system is placed in its installed location.
o
All conduits and cables are properly routed to the UPSs and to the parallel tie cabinet.
o
All power cables are properly sized and terminated.
o
Neutral conductors are installed between cabinets as required.
o
ground conductors are properly installed.
o
CAN wiring between the UPSs is properly installed.
o
Pull chain wiring between the UPSs is properly installed.
o
Adequate workspace exists around the UPSs, parallel tie cabinet, and other cabinets.
o
Startup and operational checks are performed by an authorized Eaton Customer Service Engineer for parallel
systems.
Содержание 9E
Страница 1: ...Eaton 9E UPS 20 30 kVA 208 220V Generation 3 Installation and Operation Manual ...
Страница 2: ......
Страница 3: ...Eaton 9E UPS 20 30 kVA 208 220V Generation 3 Installation and Operation Manual ...
Страница 21: ...Section 1 Installation ...
Страница 22: ......
Страница 65: ...Section 2 Operation ...
Страница 66: ......
Страница 113: ......
Страница 114: ... P 164000301 1 P 164000301 1 ...