Use the following basic sequence of steps to install the Eaton 93PM Integrated Accessory Cabinet-Distribution
(IAC-D):
1.
Create an installation plan for the IAC-D.
2.
Prepare your site for the IAC-D.
3.
Inspect and unpack the IAC-D.
4.
Unload and install the IAC-D, and wire the system.
5.
Complete the Installation Checklist.
6.
Have authorized service personnel perform preliminary operational checks and start up the UPS system.
NOTE
Startup and operational checks must be performed by an authorized Eaton Customer
Service Engineer, or the warranty terms specified on the product's resources page
become void. See
for details. This service is offered as part of the
sales contract for the UPS. Contact an Eaton service representative in advance (a
minimum two-week notice is required) to reserve a preferred startup date.
33..11
C
Crreeaattiinngg aann IInnssttaallllaattiioonn P
Pllaann
Before installing the IAC-D, read and understand how this manual applies to the system being installed. Use
the procedures and illustrations in this section to create a logical plan for installing the IAC-D. This section
contains the following information:
•
Physical features and requirements, including dimensions
•
Power wiring installation information
33..22
P
Prreeppaarriinngg tthhee S
Siittee
For the UPS system to operate at peak efficiency, the installation site should meet the environmental
parameters outlined in this manual. The operating environment must meet the weight, clearance, and
environmental requirements specified for the applicable accessory cabinet.
33..22..11
EEnnvviirroonnm
meennttaall aanndd IInnssttaallllaattiioonn C
Coonnssiiddeerraattiioonnss
The UPS system installation, including the IAC-D, must meet the following guidelines:
•
The system must be installed on a level floor suitable for computer or electronic equipment.
•
The system must be operated at an altitude no higher than 1500m (5000 ft) without derating. For additional
assistance with high altitude operation, contact an Eaton service representative (see paragraph
•
The system must be installed in a temperature and humidity controlled indoor area free of conductive
contaminants.
Failure to follow guidelines may void your warranty.
The basic environmental requirements for operation of the IAC-D are:
•
Recommended Operating Range: 5–40°C (41–104°F)
•
Maximum Relative Humidity: 5–95%, noncondensing
The IAC-D ventilation requirements are shown in