Figure 20. UPS Forklift Locations
I/O Section Forklift Location
ISBM/PM Section Forklift Location
8.
Proceed to paragraph
Installing and Connecting the UPS Sections
44..33
IInnssttaalllliinngg aanndd C
Coonnnneeccttiinngg tthhee U
UP
PS
S S
Seeccttiioonnss
44..33..11
P
Prreeppaarriinngg tthhee U
UP
PS
S S
Seeccttiioonnss
NOTE
For the following steps, verify that the forklift or pallet jack is rated to handle the weight
of the section (see
for cabinet weight).
Position the sections as follows:
Use care during installation to protect components mounted on the right side of the I/O section and the inter-
cabinet wiring harnesses attached to the left side ISBM/PM section from damage.
Содержание 9395XC
Страница 8: ......
Страница 16: ...xvi Eaton 9395XC UPS 1200kW 1200kVA 1350kW 1350kVA or 1500kW 1500kVA 164001079 Rev 01 List of Figures ...
Страница 18: ...xviii Eaton 9395XC UPS 1200kW 1200kVA 1350kW 1350kVA or 1500kW 1500kVA 164001079 Rev 01 List of Tables ...
Страница 26: ...8 Eaton 9395XC UPS 1200kW 1200kVA 1350kW 1350kVA or 1500kW 1500kVA 164001079 Rev 01 Introduction ...
Страница 118: ...100 Eaton 9395XC UPS 1200kW 1200kVA 1350kW 1350kVA or 1500kW 1500kVA 164001079 Rev 01 Understanding UPS Operation ...
Страница 160: ...16400107901 164001079 01 ...