P-164000341
8-10 kVA, 50/60 Hz (1-phase input) &
8-15 kVA, 50/60 Hz (3-phase input)
iii
Revision 1
User's Guide
List of Figures
Figure 2-1: Marine UPS units 8-15 kVA type approved models............................................................................................................4
Figure 3-1: Type designation label.........................................................................................................................................................8
Figure 4-1: Marine UPS units 8-15 kVA................................................................................................................................................ 9
Figure 5-1: Marine UPS unit with internal input transformer.............................................................................................................. 11
Figure 5-2: UPS with battery module(s) and the rear mounted mechanical bypass switch................................................................12
Figure 5-3: UPS unit with the factory installed isolation transformer................................................................................................. 13
Figure 6-1: The location of the power terminals for UPS unit without an internal transformer.......................................................... 16
Figure 6-2: The location of the power terminals for UPS unit with an internal input transformer...................................................... 17
Figure 6-3: Cable connections into a transformer section.................................................................................................................. 18
Figure 6-4: The location of the power terminals for UPS unit with an internal output transformer.................................................... 19
Figure 6-5: Wiring diagram of 9155 N-model (3-phase in / 1-phase out). For cable and fuse sizes, see the Table 6-1........................21
Figure 6-6: Wiring diagram of type approved 9155 N-model (3-phase in / 1-phase out). For cable and fuse sizes, see the Table 6-1....22
Figure 6-7: Wiring diagram of 9155 NT-model with internal MBS (3-phase in / 1-phase out). For cable and fuse sizes, see the
Table 6-2........................................................................................................................................................................................ 24
Figure 6-8: Wiring diagram of type approved 9155 NT-model with internal MBS (3-phase in / 1-phase out). For cable and fuse
sizes, see the Table 6-2................................................................................................................................................................ 25
Figure 6-9: Wiring diagram of 9155 S-model (1-phase in / 1-phase out). For cable and fuse sizes, see the Table 6-3........................ 27
Figure 6-10: Wiring diagram of type approved 9155 S-model (1-phase in / 1-phase out). For cable and fuse sizes, see the Table
6-3.................................................................................................................................................................................................. 28
Figure 6-11: Wiring diagram of 9155 ST-model with internal MBS (1-phase in / 1-phase out). For cable and fuse sizes, see the
Table 6-3........................................................................................................................................................................................ 29
Figure 6-12: Wiring diagram of type approved 9155 ST-model with internal MBS (1-phase in / 1-phase out). For cable and fuse
sizes, see the Table 6-3................................................................................................................................................................ 30
Figure 6-13: Wiring diagram of 9355 N-model (3-phase in / 3-phase out). For cable and fuse sizes, see the Table 6-4......................32
Figure 6-14: Wiring diagram of type approved 9355 N-model (3-phase in / 3-phase out). For cable and fuse sizes, see the Table
6-4.................................................................................................................................................................................................. 33
Figure 6-15: Wiring diagram of 9355 NT-model (3-phase in / 3-phase out). For cable and fuse sizes, see the Table 6-4.................... 34
Figure 6-16: Wiring diagram of type approved 9355 NT-model (3-phase in / 3-phase out). For cable and fuse sizes, see the
Table 6-4........................................................................................................................................................................................ 35
Figure 6-17: Connections of the UPS unit and External Battery Cabinets..........................................................................................37
Figure 6-18: Cable connections of the External Battery Cabinet........................................................................................................ 38
Figure 6-19: To minimise safety risk or - cable from battery string before connecting UPS and EBCs.............................. 39
Figure 7-1: Location of control cable terminals: Signal inputs (X44 & X45); EPO (NC (X12) & NO (X52)); RS-232 (X53); Relay
output (X57)................................................................................................................................................................................... 40
Figure 7-2: Identification of the interface port pins.............................................................................................................................41
Figure 7-3: External control cable connections to the UPS................................................................................................................ 42
Figure 7-4: EPO relay and the connection diagram.............................................................................................................................44
Figure 7-5: Earth fault monitor and the connection diagrams for 9155 and 9355 models..................................................................45
Figure 7-6: Location of empty XSlot bays........................................................................................................................................... 46
Figure 7-7: ConnectUPS-X Web/SNMP Module and Environmental Monitoring Probe...................................................................... 47
Figure 7-8: AS400 Relay Module.........................................................................................................................................................47
Figure 7-9: Modus/Jbus Module..........................................................................................................................................................48
Figure 9-1: The normal (UPS supplying the load) positions of the MBS switches............................................................................. 60
Figure 9-2: The normal positions of the MBS switches..................................................................................................................... 60
Figure 9-3: The positions of the MBS switches in the mechanical bypass mode.............................................................................. 61
Figure 9-4: The normal (UPS supplying the load) positions of the MBS switches............................................................................. 63
Figure 9-5: The normal positions of the three MBS switches............................................................................................................63
Figure 9-6: The positions of the three MBS switches in the mechanical bypass mode.....................................................................64
Figure 9-7: The normal positions of the MBS switches in the Normal mode.................................................................................... 65
Figure 10-1: Parallel configurations with UPS modules...................................................................................................................... 66
Figure 10-2: Dimensions of the Tie Cabinet....................................................................................................................................... 67
Figure 10-3: Cable routing of the Tie Cabinet: 1-phase model on the left and 3-phase model on the right........................................68
Figure 10-4: 1-phase Tie Cabinet’s wiring diagram with three UPS units.......................................................................................... 68
Figure 10-5: 1-phase Tie Cabinet’s wiring diagram with two UPS units and bypass connected........................................................ 69
Figure 10-6: 3-phase Tie Cabinet’s wiring diagram with three UPS units.......................................................................................... 70
Figure 10-7: 3-phase Tie Cabinet’s wiring diagram with two UPS units and bypass connected........................................................ 71
Figure 10-8: Bypass wiring diagram and cable length notes.............................................................................................................. 73
Figure 10-9: XSlot Hot Sync card and terminal interface.................................................................................................................... 74
Figure 10-10: Communication cabling wiring...................................................................................................................................... 75
Figure 10-11: XSlot HotSync card and jumper settings...................................................................................................................... 75
Figure 11-1: WEEE symbol..................................................................................................................................................................78
Figure 11-2: Recycling batteries symbol............................................................................................................................................. 78
Figure 12-1: Standard and type approved marine UPS models with one bottom battery module......................................................79
Figure 12-2: Standard and type approved marine UPS models with two bottom battery modules.................................................... 80
Figure 12-3: Standard and type approved marine UPS models with one bottom transformer module...............................................81
Figure 12-4: Standard and type approved marine UPS models with middle battery and bottom transformer module....................... 82
Figure 12-5: Standard and type approved marine UPS models with no battery or transformer modules........................................... 83
Figure 12-6: External battery cabinet models with two and three modules....................................................................................... 84
Figure 13-1: Internal transformer wirings for 9155 NT model............................................................................................................ 85
Figure 13-2: Internal transformer wirings for 9155 ST model.............................................................................................................86
Figure 13-3: Internal transformer wirings for 9355 NT model............................................................................................................ 87
Содержание 9155 N
Страница 2: ......