
I.B. 70A2580H02
Page v
Effective November 2012
Page
5-3.1 Operation of Stored Energy Mechanism ..................................................................................... 16
5-3.2 Charging ....................................................................................................................................... 16
5-3.3 Closing
Operation ................................................................................................................... 18
5-3.4 Tripping
Operation .................................................................................................................. 18
5-4 Control
Schemes ................................................................................................................................. 18
5-4.1 Timing ..................................................................................................................................... 18
5-4.2 Secondary Disconnects .......................................................................................................... 18
5-4.3 Secondary Terminal Connections ........................................................................................... 22
5-4.4 Under
voltage Trip Device....................................................................................................... 22
5-5 Interlocks
and
Interfacing .................................................................................................................... 23
5-6 Levering
Mechanism (VCP-Wind Only) ............................................................................................... 23
5-7 Operations
Counter ............................................................................................................................. 23
5-8 Ground
Contact ................................................................................................................................... 23
5-9
MOC and TOC Switch Operations....................................................................................................... 23
SECTION 6: INSPECTION, MAINTENANCE AND TROUBLESHOOTING
6-1 Introduction ......................................................................................................................................... 25
6-2
Frequency of Inspection and Maintenance .......................................................................................... 25
6-2.1
Qualified
Personnel ............................................................................................................... 25
6-2.2
Helpful Tools and Accessory Items ....................................................................................... 25
6-2.3 General
Torque Guidelines ................................................................................................... 25
6-3
Inspection and Maintenance Procedures............................................................................................. 27
6-4
Vacuum Interrupter Integrity Test ........................................................................................................ 28
6-5 Insulation............................................................................................................................................. 28
6-6 Insulation
Integrity
Check .................................................................................................................... 29
6-7
Primary Circuit Resistance Check ....................................................................................................... 29
6-8 Mechanism
Check ............................................................................................................................... 30
6-10.1 CloSure
TM
Test ...................................................................................................................... 30
6-9 Lubrication........................................................................................................................................... 34
6-10 Troubleshooting
Chart ......................................................................................................................... 34
SECTION 7: RENEWAL PARTS
7-1
General .............................................................................................................................................. 38
7-1.1 Ordering Instructions ................................................................................................................. 38
FIGURES
Figure
Title
Page
1-2 Type VCP-Wind 38kV Drawout Circuit Breaker Outline and Dimensions............................................... 3
3-1
VCP-Wind 38kV Drawout Vacuum Circuit Breaker ................................................................................. 7
3-2
VCP-Wind 38kV Vacuum Circuit Breaker with Front Cover Removed....................................................8
3-3
Rear View VCP-WIND 38kV Drawout Circuit Breaker ........................................................................... 9
3-4 Typical
VCP-Wind 38kV Front Cover................................................................................................... 10
Содержание 380 VCP-Wind
Страница 2: ......
Страница 23: ...I B 70A2580H02 Page 17 Effective November 2012 Figure 5 2 Closing Cam and Trip Linkage ...
Страница 25: ...I B 70A2580H02 Page 19 Effective November 2012 Figure 5 3 Charging Schematic ...
Страница 26: ...Page 20 I B 70A2580H02 Effective November 2012 Figure 5 4 Typical VCP Wind DC Control Schematics ...
Страница 27: ...I B 70A2580H02 Page 21 Effective November 2012 Figure 5 5 Typical VCP Wind AC Control Schematics ...
Страница 47: ...I B 70A2580H02 Page 41 Effective November 2012 Table 7 2 38kV VCP Wind Mini Module Code Pin Position Chart ...
Страница 49: ...I B 70A2580H02 Page 43 Effective November 2012 ...