8
Eastwood Technical Assistance: 800.343.9353 >> [email protected]
1.
Attach Cabinet Back Panel (C) to the rear flanges of Cabinet
Side Panels (E) and (I) and Hopper Back Panel (J) with fifteen
M6 x 12mm screws (AA).
NOTE:
not all holes receive screws at
this time, refer to figure 12 for locations and be sure that larger
punched holes are in proper orientation. (Do not fully tighten
screws at this time to allow for alignment of remaining leg holes.)
(FIG. 12)
.
2.
Install 2 Legs (G) to the rear flanges of Cabinet Side Panels (E)
& (I), Cabinet Back Panel (C) and Hopper Back Panel (J) with
sixteen M6 x 12mm screws (AA) and nuts (EE). Do not fully
tighten screws at this time
(FIG. 12)
.
3.
Peel away protective paper and apply Thin Sealing Foam (KK)
along the front-facing flanges of Cabinet Side Panels (E) and (I)
and Hopper Front Panel (K)
(FIG. 13)
.
4.
Attach Cabinet Front Panel (H) to the front flanges of Cabinet
Side Panels (E) & (I) and Hopper Front Panel (K) with thirteen M6
x 12mm screws (AA).
NOTE:
not all holes receive screws at this
time, refer to figure 12 for locations. (Do not fully tighten screws
at this time to allow for alignment of remaining leg holes)
(FIG.
14)
.
5.
Install 2 Legs (G) to the rear flanges of Cabinet Side Panels (E)
and (I), Cabinet Front Panel (H) and Hopper Front Panel (K) with
sixteen M6 x 12mm screws (AA) and nuts (EE). Do not fully
tighten screws at this time
(FIG. 14)
.
FIG. 12
FIG. 13
FIG. 14
E
I
AA
G
G
C
E
I
KK
K
H
G
AA
G
29 Pcs. AA M6 x 12mm Screw
14 Pcs. EE M6 Nut
31 Pcs. AA M6 x 12mm Screw
20 Pcs. EE M6 Nut