HOPPER ASSEMBLY
1.
Peel away protective paper and apply Thin Sealing Foam (KK) on
the
INNER
face, along the bottom of the flanges of Hopper Back
Panel (J) and Hopper Front Panel (K)
(FIG. 1)
.
2.
Install Hooper Drain Latch (Z) onto Hopper Front Panel (K) with
loop facing small end and attach with two M4 x 10 screws (CC)
and two washers (GG) then tighten
(FIG. 2)
.
3.
Attach 1st Hopper Side Panel (L) to Hopper Front Panel (K)
with five M6 x 12mm screws (AA) and nuts (EE) trapping the
Sealing Foam between panels. (Do not fully tighten screws
at this time)
(FIG. 2)
.
4.
Attach 2nd Hopper Side Panel (L) to opposite side of Hopper Front
Panel (K) with five M6 x 12mm screws (AA) and nuts (EE) trapping
the Sealing Foam between panels. (Do not fully tighten screws at
this time)
(FIG. 3)
.
4
Eastwood Technical Assistance: 800.343.9353 >> [email protected]
FIG. 1
FIG. 2
J
KK
KK
KK
K
EE
AA
L
Z
CC
K
FIG. 3
EE
AA
L
5 Pcs. AA M6 x 12mm Screw
5 Pcs. EE M6 Nut
ASSEMBLY HAZARD!
• Install a shutoff valve on the air supply line
for emergency shutoff.
• Wear safety goggles and work gloves
during assembly.
KK
2 Pcs. CC M4 x 10mm Screw
2 Pcs. GG M4 Washer
5 Pcs. AA M6 x 12mm Screw
5 Pcs. EE M6 Nut