1.
Attach Hopper Back Panel (J) to Hopper Side Panels (L) with
ten M6 x 12mm screws (AA) and nuts (EE) trapping the Sealing
Foam between panels
(FIG. 4)
.
2.
Make sure all four panel edges at top and bottom of Hopper
Assembly are flush and then evenly tighten the M6 x 12mm
screws
(FIG. 4)
.
3.
Peel away protective paper and apply Thin Sealing Foam (KK) on
the bottom of the flange of Hopper Assembly
(FIG. 5
).
4.
Attach Hopper Bottom Frame (Y) to Hopper Assembly with
eight M4 x 10mm screws (CC) and 4mm Flat Washers (GG).
Tighten screws
(FIG. 5)
.
5.
Install the Hopper Drain Door (N) to Hopper Back Panel (J)
with three M6 x 12 mm screws and tighten
(FIG. 5)
.
6.
Attach four Hopper Corner Reinforcements (P) to the INSIDE of
Upper Hopper Flange with four M4 x 10mm screws (CC) and
4mm Flat Washers (GG). Tighten screws
(FIG. 6)
.
To order parts and supplies: 800.343.9353 >> eastwood.com
5
FIG. 4
FIG. 5
FIG. 6
AA, EE
AA
N
Y
GG
CC
KK
GG
CC
P
J
AA, EE
J
L
10 Pcs. AA M6 x 12mm Screw
10 Pcs. EE M6 Nut
8 Pcs. CC M4 x 10mm Screw
8 Pcs. GG M4 Washers
3 Pcs. AA M6 x 12mm Screw
8 Pcs. CC M4 x 10mm Screw
8 Pcs. GG M4 Washers