13
implements a common neutral and a common ground.
Before powering the Model 150, use a test plug or
multimeter to ensure that the existing wiring of the plugs
inside the Earth Outdoor furnace is correct. A continuity
tester should also be used to ensure that no wires are
reversed between the power source and the furnace.
IBC-3.1 External Wiring Requirements for
Switches and Breakers
The catalyst pre-heater is on for approximately one to five
minutes in each call for heat (CFH) cycle of the Earth Outdoor
furnace. The heater needs 120 VAC to work properly and will
draw approximately 8.3 Amps of current for a standard
heater and 14 Amps for a extended heater. Often an Earth
Outdoor furnace will have several pumps, fans and an
external light. Please ensure that in the event of all devices
being turned on at the same time, the surge and additional
load of the heater will not trip, heat the circuit, or switch to an
unsafe level. Please consult an electrician if you do not
know how to calculate total and safe draw. Make sure that all
electrical cables between the Earth Outdoor furnace and the
breaker box are rated to handle the power needed to run all
components of the furnace. Undersized or under rated cable
will decrease the amount of clean power available to the
furnace.
IBC-3.1 Ventilation Requirements
The IBC enclosure should not be mounted in an area where
exposure to sun or the furnace itself will cause the inside of
the controller enclosure to exceed 120°F.
IBC-3.1 Voltage and Current Measurement
Proper voltage and current are very important to the
correct operation of the IBC. Please have an electrician
check to insure the furnace is providing 120 VAC to the IBC
Содержание Klear Sky 400
Страница 1: ...Klear Sky 400 P O Box 310 Mountain Grove MO 65711 417 746 0043 www EarthOutdoor com...
Страница 20: ...1...
Страница 23: ...4...
Страница 26: ...7...
Страница 56: ...37 manufacturer...
Страница 57: ...38 ClearStak LLC 90 Route 171 P O Box 875 Woodstock CT 06281 www clearstak com www facebook com ClearStakLLC...