STEP 7

 Programming the zero point

Set the caravan on level ground. Make sure that the caravan tow bar is inclined downwards and that 
the front of the caravan is thus slightly lower than the back. Press button 5 on the control unit and set 
it for manual operation (button 6). Take a spirit level and lay it within eyeshot flat on the floor of the 
caravan. Use manual operation of the supports to make sure that the caravan is standing horizontally. 
Start with horizontal adjustment of the axle supports. Never allow the force only to act on the corner 
supports. Once the axle supports have been brought into their desired position, the caravan must be 
brought to the horizontal with the front supports. Please note that it is not permitted to use the rear 
supports at all!

It is possible that during this procedure, the red lamp (lamp 1) may flash continuously. This you may 
ignore. When the caravan is standing horizontally both lengthways and widthways, you have found 
the zero point. So that this zero point can now be programmed, the unit must be turned off and then 
on again by pressing button 5. Then press button 12 (extend front supports) five times, one after 
another. Execution of this step will now be acknowledged by the unit with an acoustic signal. Then press 
button 11 five times in a row (extend rear supports). There will again be an acoustic signal five time in 
confirmation. Now all lamps will be lit. Press button 8 three times (withdraw supports). The only lamp 
now lit will be that for manual operation (lamp 9). Switch the unit off by pressing button 5, and on 
again by pressing it once more. Now the green lamp between the four arrows in the centre light up, and 
this means that programming the zero point was successful (lamp 14). Now press button 8 to withdraw 
the supports.

!! TEST:

 Now press “Automatic extend” (button 7). The system will in this case once again level 

  the vehicle completely and fully automatically. As soon as the process is completed, the green lamp 
  between the arrows will once again light, indicating that the test has been successful.

17

SCHRITT 7

Setzen Sie den Caravan an eine ebene Stelle. Sorgen Sie dafür, dass die Deichsel des Cara-

vans nach unten geneigt ist und somit die vordere Seite niedriger liegt als die hintere Seite. 

Drücken Sie die Taste 5 am Bedienteil und stellen Sie auf manuelle Bedienung (Taste 6). 

Nehmen Sie eine Wasserwaage und setzen Sie diese in Sichtweite eben auf den Boden des 

Caravans. Sorgen Sie durch die manuelle Bedienung der Stützen dafür, dass der Caravan 

waagerecht steht. Beginnen Sie mit der waagerechten Ausrichtung der Achsstützen. Las-

sen Sie die Kraft niemals nur auf die Eckstützen wirken. Nachdem die Achsstützen in ihre 

vorgesehene Position gebracht wurden, muss der Caravan mit den vordere Stützen in eine 

waagerechte Lage gebracht werden. Bitte beachten Sie, dass Sie in keinem Fall die hinteren 

Stützen nutzen dürfen! 

Es ist übrigens möglich, dass während dieses Prozesses die rote Lampe (Lampe 1) dauerhaft 

blinkt. Dies können Sie unberücksichtigt lassen. Wenn der Caravan sowohl in Bezug auf die 

Länge als auch die Breite vollkommen waagerecht steht, haben Sie den Nullpunkt gefunden. 

Damit dieser Nullpunkt programmiert werden kann, muss die Installation durch die jeweilige 

Betätigung der Taste 5 zunächst aus- und anschließend wieder eingeschaltet werden. Drüc-

ken Sie anschließend fünfmal auf die Taste 12 (vordere Stützen ausfahren). Die Ausführung 

dieses Schrittes wird von der Anlage mit einem akustischen Signal bestätigt. Drücken Sie 

anschließend fünfmal in Folge die Taste 11 (hintere Stützen ausfahren). Wiederum wird zur 

Bestätigung ein akustisches Signal ertönen (5x). Nun brennen alle Lampen. Drücken Sie nun 

dreimal die Taste 8 (Stützen einfahren). Als einziges wird nun die Lampe für die manuelle 

Bedienung brennen (Lampe 9). Schalten Sie die Installation durch Betätigung der Taste 5 aus 

und durch nochmaliges Drücken wieder an. Nun wird die grüne Lampe zwischen den vier 

Pfeilen in der Mitte leuchten und dies bedeutet, dass die Programmierung des Nullpunkts 

erfolgreich verlaufen ist (Lampe 14). Fahren Sie nun die Stützen ein (Taste 8). 

TEST:

 Drücken Sie auf automatisch 

Ausfahren (Taste 7). Das System 

wird das Fahrzeug in diesem Fall 

erneut vollständig automatisch 

waagerecht nivellieren. Sobald 

dieser Prozess abgeschlossen ist, 

wird die grüne Lampe zwischen 

den Pfeilen wieder leuchten. Dies 

ist ein Zeichen dafür, dass der Test 

erfolgreich verlaufen ist. 

7. Programmierung des Nullpunkts

Содержание LEVEL SYSTEM

Страница 1: ... English Electronic Levelling System Assembly Manual ...

Страница 2: ...g the pump Page 77 4 Laying the pipework Page 78 5 Installing the electronics Page 81 6 Taking the system into service Page 82 7 Programming the zero point Page 83 8 Finishing and maintenance of the installation Page 84 Five tips for the customer Page 84 Layout of the hydraulic pipework Page 85 General Terms and Conditions of Trade Page 86 Order list for the axle brackets Page 87 ...

Страница 3: ...ground If installed without the necessary expertise extensive damage may be caused in a flash to say nothing of personal injury This is why the system may only be installed by properly trained fitters with extensive practical experience and who have been trained in this particular field The fitters themselves remain at all times responsible for the installation of the system This document is based...

Страница 4: ...e return from the axle supports c One type 3 hose for the rear corner supports d One type 3R hose for the return from the rear corner supports e One type 4 hose for the front corner supports f One type 4R hose for the return from the front corner supports g One type 5R hose intermediate hose pump crosspiece 8 Fixing material for the hydraulic pipework 9 Six distributors for the hydraulic hoses a f...

Страница 5: ...different and the studs are located in mirror image with respect to the corner supports You will find details of the corner supports front left front right rear left and rear right on a small sticker on the guide rails of the corresponding products Now fix the new supports in their corresponding positions using two M8 bolts Do not forget to place the two aluminium spacers on the M8 drill holes Whe...

Страница 6: ...orts Do not forget to apply to the two aluminium filler plates 4 Fully tighten one of the three fixing screws 8 Schritt 1 1 Demontage der alten Eckstützen 2 Entfetten des Bodens und der neuen Eckstützen 3 Kleber z B Sika 221 an der Oberseite der Aluminium Laufschiene der neuen Eckstützen auftragen Dabei dürfen die beiden Füllplatten aus Aluminium nicht vergessen werden 4 Festziehen einer der drei ...

Страница 7: ...that the cylinder does not foul anything Fitting the axle supports 9 2 Montage der Achsstützen SCHRITT 2 Bei der Bestellung hatten Sie uns die Marke und den Typ des Chassis des Caravans genannt an dem unser System montiert werden soll Der Firma E P Hydraulics stehen für alle Caravantypen die passenden Adapter zur Verfügung und der für ihre Zwecke vorgesehenen Adapter wurde entsprechend mitgeliefer...

Страница 8: ...fter this the bolts are fully tightened Finally check that the axle supports hang vertically and are inclined neither inwards nor outwards nor to front or rear Warning Fixing the supports is probably the most important step of all in fitting the E P levelling system and therefore suitable expertise in this field is indispensable The forces which act on the system and the caravan must in no circums...

Страница 9: ...ans wichtig Die Pumpe muss vor ihrer Installation ringsum in den dafür vorgesehenen Rand geklebt werden Zudem muss ein Streifen Kleber in der Mitte direkt unter der Steuerung gegeben werden denn dies ist für die Steuerung wichtig Zur Vermeidung von Störungen muss die Pumpe eben stehen und der Boden bei der Steuerung die Last über die vollständige Fläche aufnehmen Das kleben der Pumpeneinheit ist u...

Страница 10: ...n sets can be ordered to obtain the necessary length of pipes Please refer to the layout shown on Page 85 Begin laying the hoses from the pump and make sure that there are no kinks in the hoses as every kink is associated with a marked weakening of the system Please note particular attention should be paid to the couplings on the corner supports please ensure that the hoses cannot possibly be squa...

Страница 11: ...nffachverteiler Kreuzverbinder mit T Stück Der letzte Anschluss ist für den Schlauch 5R vorgesehen der am anderen Ende an den hinteren Eingang der Pumpe angeschlossen werden muss Montage der T Stücke in den Leitungen Überschüssige Leitungslängen müssen in Form einer großen Schleife zusammengebunden werden Die Leitungen sind mit dem mitgelieferten Material am Boden zu befestigen Die Leitungen müsse...

Страница 12: ...ided with cable ties at the factory These are to keep them safe during assembly Do not forget to cut through the transport cable ties as soon as the hoses are properly secured to the floor with the specially supplied fixing material 14 aneinander haken Berücksichtigen Sie auch dass sich die Leitungen an e wenn sie plötzlich unter Druck stehen Die Leitungen müssen entsprechend geschützt werden An a...

Страница 13: ...st an verschiedenen Orten möglich allerdings darf der Behälter in keinem Fall mit Feuchtigkeit in Berührung kommen Eine weitere Bedingung besteht natürlich darin dass die Verkabelung ohne Probleme genutzt werden kann Platzieren Sie das Bedienteil so dass das System von außen gesteuert werden kann Während der Bedienung und des Aufstellens der Stützen darf sich aufgrund der Be wegungen niemand im Ca...

Страница 14: ...m is now bled 16 6 Inbetriebnahme des Sy SCHRI Bei der Kraft a dafür d werden zen Sie neel fo Schalte Die La vordere ken Ha wird si schrittw lange g fahren Zylinde Führen teren S 11 Für für die hen Nu Wenn haben Gleitra Fahren schalte Sie die ließend Betätig Wiede noch z Das Sy Vollendung der Montage der Eckstütze Befestigen der letzten beiden Befestigungsschrauben Vorbohren der letzten beiden Bef...

Страница 15: ...l lamp 14 Now press button 8 to withdraw the supports TEST Now press Automatic extend button 7 The system will in this case once again level the vehicle completely and fully automatically As soon as the process is completed the green lamp between the arrows will once again light indicating that the test has been successful SCHRITT 7 Setzen Sie den Caravan an eine ebene Stelle Sorgen Sie dafür d va...

Страница 16: ...tion option is especially recommended when condition of the ground is poor Please remember that the system cannot handle all corners at once and that when in automatic mode a red lamp will light up In these cases you should set the caravan to the zero point in manual mode Another possibility is to set the caravan on wedges and to fill in empty spaces underneath the feet System control to prevent t...

Страница 17: ...85 19 Schema der Hydraulikleitungen Hydraulic pipework ...

Страница 18: ...e period the complete system or parts of it may be returned to the company E P Hydraulics for assessment and repair Exclusions Excluded from the guarantee provisions are all cases of damage caused by inadequate functioning of the system as a result of incorrect installation incorrect usage of the system or failure to observe its limitations All contracts concluded with us are subject to the GENERA...

Страница 19: ...ontage hinter der Achse __________________________________ ______________________________________ Type caravan und andere Details ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ 21 Bestelliste der Achsbüge...

Страница 20: ...ry address Postcode city Country Phone E Mail VAT number E P Hydraulics United Kingdom Mr Oliver Drinkwater unit 13 Elder Court Lions Drive Shadsworth Business Park Blackburn Lancashire BB1 2EQ Phone 44 0 1245 297785 Fax 44 0 1200 300110 www ep hydraulics co uk oliver ep hydraulics co uk ...

Страница 21: ...89 Notes ...

Страница 22: ...90 Notes ...

Отзывы: