Installation, Operation and Parts Manual
EE-6605B.PD
19
MAINTENANCE
Easy
and
low
cost
routine
maintenance
can
ensure
the
lift
work
normally
and
safely.
Following
are
requirements
for
routine
maintenance.
You
may
choose
the
frequency
of
routine
maintenance
by
consulting
your
lift’s
working
conditions
and
time.
S/N
Components
Methods
Period
1
Control
buttons
Check
if
control
buttons
work
as
"hold
‐
to
‐
run
"
and
check
if
they
work
as
the
function
indicated.
Every
day
2
Max
height
limit
switch
Push
the
UP
button
and
inspect
and
ensure
the
lifting
platform
stops
rising
at
maximum
lifting
height.
Every
day
3
Pneumatic
filter
Listen
and
inspect
the
filter
to
ensure
no
leakage.
Inspect
and
ensure
the
water
level
is
below
its
max
limit
mark
and
the
oil
level
is
above
the
minimum
limit
mark.
Every
day
4
Hydraulic
block
and
valves
Inspect
if
the
valves
leak
or
not.
Clean
or
change
the
valve
if
any
leakage.
Every
day
5
Oil
hoses
and
connectors
Inspect
to
ensure
no
leakage
before
using
the
lift.
Every
day
6
Pneumatic
hoses
and
connectors
Inspect
to
ensure
no
leakage
before
using
the
lift.
Every
day
7
Mechanical
safety
catch
Check
if
both
mechanical
catches
can
engage
and
disengage
simultaneously
by
pushing
control
buttons.
Every
day
8
Lifting
platform
Check
the
synchronization
of
both
lifting
platforms.
Ensure
both
platforms
ascend
and
descend
synchronously.
Every
day
9
Terminals
in
the
control
unit
Open
the
control
unit,
inspect
the
wire
terminals
and
screw
firmly
if
any
terminals
become
loose.
Every
3
months
10
Joint
shafts
Add
grease
into
the
oil
cups.
Every
3
months
11
Anchored
expansion
bolts
Check
with
torque
spanner.
For
M18
bolt
,the
torque
is
no
less
than
80N.m.
For
M16,
the
torque
is
no
less
than
60N.m
Every
3
months
12
Circlips
of
oil
cylinder
shaft
Inspect
if
any
circlip
goes
off
its
groove.
Make
sure
they
are
positioned
in
the
grooves.
Every
3
months
13
Rolling
wheels
and
their
running
tracks
Push
the
UP
and
DOWN
button
to
check
if
the
wheel
is
over
‐
worn
or
can
not
roll.
Add
grease
to
ensure
smooth
running.
Change
over
‐
worn
wheels.
Every
3
months
14
Self
‐
locking
nut
Check
with
torque
spanner.
The
torque
should
be
no
less
than
330N.m.
Every
3
months
15
Whole
Lift
Running
the
lift
for
several
cycles
with
and
without
rated
load.
The
lift
can
run
steadily
and
smoothly
with
no
abnormal
noise.
Every
3
months
16
Hydraulic
oil
Change
the
oil
6
months
after
initial
use
and
once
per
year
thereafter.
Inspect
the
hydraulic
oil
and
change
the
oil
if
the
oil
becomes
black
or
there
is
dirt
in
the
oil
tank.
Every
year
Содержание EE-6605B.PD
Страница 21: ...Installation Operation and Parts Manual EE 6605B PD 21 Floor plan for surface installation...
Страница 22: ...Installation Operation and Parts Manual EE 6605B PD 22 Annex 2 Electrical shcemes and parts list...
Страница 23: ...Installation Operation and Parts Manual EE 6605B PD 23...
Страница 24: ...Installation Operation and Parts Manual EE 6605B PD 24...