background image

 

Installation, Operation and Parts Manual 

                                                                                                                         

                                 

EE-6605B.PD  

               

               

 

16

5.4

 

Operation

 

instructions

   

To

 

avoid

 

personal

 

injury

 

and/or

 

property

 

damage,

 

permit

 

only

 

trained

 

personel

 

to

 

operate

 

the

 

lift.

 

After

 

reviewing

 

these

 

instructions,

 

get

 

familiar

 

with

 

lift

 

controls

 

by

 

running

 

the

 

lift

 

through

 

a

 

few

 

cycles

 

before

 

loading

 

vehicle

 

on

 

lift.

 

Always

 

lift

 

the

 

vehicle

 

using

 

both

 

platforms

 

.

 

Never

 

raise

 

just

 

one

 

end,

 

one

 

corner

 

or

 

one

 

side

 

of

 

vehicle.

   

Using

 

the

 

lift

   

Raise

 

the

 

lift

 

Make

 

sure

 

vehicle

 

is

 

neither

 

front

 

nor

 

rear

 

heavy

 

and

 

center

 

of

 

balance

 

should

 

be

 

centered

 

over

 

the

 

lift.

   

1.

 

Make

 

sure

 

that

 

you

 

have

 

read

 

and

 

understood

 

the

 

operation

 

manual

 

before

 

operation.

 

2.

 

Drive

 

and

 

park

 

the

 

vehicle

 

midway

 

between

 

two

 

platforms.

 

3.

 

Turn

 

the

 

selection

 

switch

 

on

 

the

 

control

 

panel

 

to

 

“Main

 

lift

 

 

and

 

push

 

the

 

“UP”

 

button

 

to

 

rasie

 

the

 

lifting

 

platform

 

a

 

little

 

bit

 

off

 

the

 

ground

 

and

 

check

 

the

 

stability

 

of

 

the

 

lifted

 

vehicle.

 

.

 

4.

 

Having

 

raised

 

the

 

vehicle

 

to

 

the

 

desired

 

height,

 

operators

 

must

 

push

 

the

 

“Safety

 

Lock”

 

button

 

to

 

ensure

 

the

 

mechanical

 

safety

 

lock

 

is

 

engaged.

 

Check

 

again

 

the

 

stability

 

before

 

performing

 

maintenance

 

or

 

repair

 

work.

 

Lower

 

the

 

lift

 

When

 

lowering

 

the

 

lift

 

pay

 

carefull

 

attention

 

that

 

all

 

personnel

 

and

 

objects

 

are

 

kept

 

clear.

 

 

1.

 

Turn

 

on

 

the

 

power

 

switch.

   

2.

 

Push

 

”DOWN

 

I”

 

button

 

to

 

lower

 

the

 

lift.

 

It

 

will

 

stop

 

lowering

 

at

 

safety

 

height

 

off

 

the

 

groud.

   

3.

 

Push

 

“DOWN

 

II”

 

button

 

to

 

continue

 

lowering

 

the

 

platforms.

 

Meanwhile

 

the

 

buzz

 

alarms.

   

 

 

 

 

 

 

 

 

 

 

 

 

 

Содержание EE-6605B.PD

Страница 1: ...issor lift heavy duty Electrical Leveling Lifting Capacity 5500KG Installation Operation and Parts Manual Please read this entire manual carefully and completely before installation or operation of th...

Страница 2: ...and are protected against duplication and reproduction by copyright laws international agreements and other domestic legislation The reproduction or disclosure of instructions or an extract thereof is...

Страница 3: ...descriptions 9 3 2 Construction of the lift 9 3 3 Dimensions 10 3 4 Technical data 10 INSTALLATION INSTRUCTIONS 11 4 1 Preparations before installation 11 4 2 Installation attentions 12 4 3 General in...

Страница 4: ...r qualified persons 1 2 1 Scope of checking Regular checking essentially involves performing a visual inspection and a functional test This includes checking the condition of the components and equipm...

Страница 5: ...fety locks are engaged before any attempt to work near or under the vehicle Never remove safety related components from the lift Do not use if safety related components are damaged or missing 1 3 11 D...

Страница 6: ...clearly depicted on the lift to ensure that the operator is aware of and avoid the dangers of using the lift in an incorrect manner The labels must be kept clean and they have to be replaced if detac...

Страница 7: ...rushing In the event of excessive vehicle weight incorrect mounting of the vehicle or on removing heavy object there is a risk of the vehicle falling off the lifting platform or tipping up Safety meas...

Страница 8: ...e all appropriate precautions never stack to more than 2 meters in height never make stacks of single packs Always stack pairs of packs in a cross pattern so that the base is bigger and the resulting...

Страница 9: ...rise accordingly The mechanical locking unit ensures no slipping in case of hydraulic failire Besides designs like 24V working voltage of control unit and limit switch low height alarming buzzer anti...

Страница 10: ...Technical data Rated capacity 5000KG Full raised height 1750mm Full lowered height 240mm Full raised time with rated load about 55s Full lowered time with rated load about 55s Pneumatic working press...

Страница 11: ...e at least 2 5mm2 wire core for 3Ph power and 4 0mm2 wire core for 1Ph power Construction of the foundation following consultation with the manufacturer s customer service or an authorized service age...

Страница 12: ...of the lifting platforms Remove the carton and packing films wrapped on the platform Attention 1 Take off oil hose protectors when cut off the packing strips Attention 2 Avoid scratching the painting...

Страница 13: ...running speed of the lift is mainly decided by the viscosity of the hydraulic oil we suggest using NO 46 hydraulic oil when average temperature of the location is above 18 degree Celsius and using NO...

Страница 14: ...load 14 If expansion bolts nuts or circlips are well secured 15 If max lifting height is 1750mm 16 If safety advices name plate and logos are clear OPERATION INSTRUCTIONS 5 1 Precautions 5 1 1 Check a...

Страница 15: ...WN I button Control the lowering movement SB3 DOWN II button Control the lowering movement for safety SB4 Safety lock button Engage the mechanical safety lock SB Emergency stop Cut operation power in...

Страница 16: ...he operation manual before operation 2 Drive and park the vehicle midway between two platforms 3 Turn the selection switch on the control panel to Main lift and push the UP button to rasie the lifting...

Страница 17: ...3 Turn the selection switch to PD 4 Using either the inspection torch or the key fob Pressing and holding the left button will operate the nearside PD plate rotation of steering from extent to extent...

Страница 18: ...se or jammed Clean or adjust it The gear pump is damaged Replace it Oil level is too low Add oil The oil hose became loose or dropped off Tighten it The cushion valve became loose or jammed Clean or a...

Страница 19: ...and disengage simultaneously by pushing control buttons Every day 8 Lifting platform Check the synchronization of both lifting platforms Ensure both platforms ascend and descend synchronously Every d...

Страница 20: ...l always keep a good working condition and its service life could be extended Annex 1 Floor plan C20 25 concrete base with strength more than 3000psi tolerance of flatness less than 5mm and minimum th...

Страница 21: ...Installation Operation and Parts Manual EE 6605B PD 21 Floor plan for surface installation...

Страница 22: ...Installation Operation and Parts Manual EE 6605B PD 22 Annex 2 Electrical shcemes and parts list...

Страница 23: ...Installation Operation and Parts Manual EE 6605B PD 23...

Страница 24: ...Installation Operation and Parts Manual EE 6605B PD 24...

Страница 25: ...402010 Emergency stop NBP2 BS542 40 1 320503002 Ground terminals 4 1 320505011 Retaining chip LT 2 5 2 QF 320801001 Circuit breaker DZ47 63C16 3P 1 QF1 320803003 Circuit breaker DZ47 63C3 1P 1 QF2 320...

Страница 26: ...ydraulic shcemes and parts list 1 oil tank 11 flow control valve 2 oil sucking filter 12 tank cover 3 gear pump 13 leveling valve 4 coupling 14 cylinder hydraulic block 5 motor 15 solenoid valve 6 hyd...

Страница 27: ...7 615031003 PD Oil cylinder GEG PD A1 B6 4 8 615026006 Secondary oil cylinder 6605B A4 B2 1 9 624001095 Secondary oil cylinder L 2000mm 1 10 410260630 Hydraulic block 6605B A3 B5 55 40 38 2 11 410260...

Страница 28: ...201103001 Hex flange screw M5 25 4 4 202109064 Hex socket cylinder head screw M6 30 4 5 207103019 Composite washer M14 6 6 310101028 Shifting connector G1 4 M14x1 5 4 7 320204016 Aluminum motor 380V...

Страница 29: ...C 1 21 330404001 Coupling YL A 1 Seal rings POS Code Name Specfication Qty Remark 1 207103009 Composite piston seal ring KGD120 95 22 4 6 35 1 Main cylinder 2 207102013 Y seal ring SD48 58 7 1 Main cy...

Страница 30: ...4 M12 1 6 310401001 Pneumatic directional valve 3V210 08DC24V 1 7 310103006 Three way pneumatic connector KLE 8 1 8 310501005 Pneumatic cylinder CQ2B32 30 2 9 310201003 Silencer SLM01 R1 8 M8 2 Annex...

Страница 31: ...8 20 202109053 Hex socket post head bolt M12X35 20 21 204104001 Washer 8X 40X2 5 4 22 202110004 Hex head full swivel bolt M8X12 4 23 201102011 Outside hex bolt M8X15 14 24 204101005 Washer 8 12 25 614...

Страница 32: ...29 Cross round headed bolt M6X12 10 56 612026006 Shaft of bracket A 6605 A12 4 57 410260151B Block of padding plate 6605 A6 B1 C3 2 58 614026013 Bracket B welding 6605 A6 B2 C1 2 59 420260030B Base pl...

Страница 33: ...8 84 410260033 Plate D of limit switch 6605 A7 B5 1 85 410260023 Plate C of limit switch 6605 A7 B4 1 86 202101002 Cross round headed bolt M3X15 4 87 320302002 Limit switch PL 05N 2 88 614026022 Conne...

Страница 34: ...15_GB818 2 13 202111007 Hex socket flat head screw M8X20_GB70_3 8 14 203103006 Hex thin nut M8_GB6172 8 15 614031222 PD side baffle plate GEG PD A1 B7 1 16 410210011 Right angle connector 6603B A9 B4...

Страница 35: ...EG PD A1 B6 2 11 614031222 PD side baffle plate GEG PD A1 B7 1 12 410310361 Holder of limit switch GEG PD A1 B8 1 13 540103072 PD name plate GEG PD A1 B9 1 14 410310191 PD cylinder sheath GEG PD A1 B1...

Отзывы: