Installation, Operation and Parts Manual
EE-6605B.PD
13
Step
5:
Connect
the
electrical
system.
Refer
to
Annex
2
when
fix
the
electrical
system.
Connect
the
wire
connectors
for
rising
and
lowering
limit
switches
Connect
the
power
supply
cable
to
external
electricity
supply.
(For
three
phase
power
supply
,if
the
lift
doesn't
raise
and
the
motor
may
turn
in
the
wrong
direction,
in
such
event,
interchange
wires
U,
V
in
the
control
cabinet)
.
Step
6:
Connect
the
pneumatic
release
system.
Screw
torque
for
oil
hose
connector
is
20N*M.
External
compressed
shall
be
prepared
by
the
end
user
before
installation.
Pneumatic
pressure:
6
‐
8bar.
Step
7:
Fill
with
hydraulic
oil.
ONLY
CLEAN
AND
FRESH
OIL
ONLY
.Lift
must
be
fully
lowered
before
changing
or
adding
hydraulic
oil.
Pour
18
liters
anti
‐
abrasion
hydraulic
oil
into
the
oil
tank.
The
level
of
oil
shall
reach
the
tippets
volume
mark
of
the
tank.
Run
the
lift
for
several
cycles
and
add
more
oil
until
the
lifting
platform
can
reach
its
maximum
height.
Note
:
As
running
speed
of
the
lift
is
mainly
decided
by
the
viscosity
of
the
hydraulic
oil,
we
suggest
using
NO.46
hydraulic
oil
when
average
temperature
of
the
location
is
above
18
degree
Celsius
and
using
NO.32
hydraulic
oil
when
temperature
is
below
18
degree
Celsius.
Change
the
oil
6
months
after
initial
use
and
change
once
per
year
thereafter.
Step
8:
Levelling
Check
the
connection
of
the
hydraulic
and
electrical
system
before
levelling
operation
Review
operation
instructions
and
get
familiar
with
lift
controls
by
running
the
lift
through
a
few
cycles
before
levelling
opearion.
Attention:
Level
the
platforms
before
connecting
max
height
limit
switch
because
if
not,
platforms
may
not
rise
to
the
highest
position.
1)
Connect
the
power
supply
and
turn
on
the
main
power
switch
on
the
control
panel
.
2)Turn
the
selection
switch
in
the
control
unit
to
“Working”
and
push
the
“UP"
button
for
30
seconds.
Normally
at
least
one
of
the
platforms
will
rise
at
this
movement.
3)Turn
the
selection
switch
to
“Levelling”
and
push
“UP”
or
“DOWN”
button
to
adjust
the
height
of
one
of
the
platforms
until
both
platforms
are
of
the
same
level.
Repeat
the
above
levelling
steps
if
synchronization
is
still
not
achieved.
Содержание EE-6605B.PD
Страница 21: ...Installation Operation and Parts Manual EE 6605B PD 21 Floor plan for surface installation...
Страница 22: ...Installation Operation and Parts Manual EE 6605B PD 22 Annex 2 Electrical shcemes and parts list...
Страница 23: ...Installation Operation and Parts Manual EE 6605B PD 23...
Страница 24: ...Installation Operation and Parts Manual EE 6605B PD 24...