Installation, Operation and Parts Manual
EE-6605B.PD
12
4.1.5
Checking
parts
Unfold
the
package
and
check
if
any
parts
missed
as
per
the
following
list.
Do
not
hesitate
to
contact
us
in
case
any
parts
missed,
but
if
you
do
not
contact
us
and
insist
installing
upon
the
lack
of
some
parts,
we
as
well
as
our
dealers
will
not
bear
any
responsibility
for
this
and
will
charge
for
any
parts
subsequently
demanded
by
the
buyer.
S/N
Name
Specification
Qty
1
Lifting
platform
6605
2
2
Control
cabinet
/
1
3
Expansion
bolt
M18*160
16
4
Rubber
pad
38*120*160
4
5
Pneumatic
hose
8mm
2m
6
Installation
manual
1
7
Key
1
8
Oil
tank
label
1
4.2
Installation
attentions
4.2.1
Joints
of
oil
hose
and
wiring
must
be
firmly
connected
in
order
to
avoid
leakage
of
oil
hose
and
loose
of
electrical
wires.
4.2.2
All
bolts
should
be
firmly
screwed
up.
4.2.3
Do
not
place
any
vehicle
on
the
lift
in
the
case
of
trial
running.
4.3
General
installation
steps
Step
1:
Dismantle
the
package
of
the
lifting
platforms.
Remove
the
carton
and
packing
films
wrapped
on
the
platform.
Attention
1:
Take
off
oil
hose
protectors
when
cut
off
the
packing
strips.
Attention
2:
Avoid
scratching
the
painting
surface
and
hoses.
Step
2:
Use
proper
means
to
place
the
lifting
platform
at
expected
installation
site.
Raise
the
upper
platform
by
using
a
forklift
and
2
lifting
strings
until
the
mechanical
lock
is
engaged.
And
then
hoist
the
platform
to
the
expected
installation
site.
Attention1:
Before
hoisting,
make
sure
the
hoses
and
wires
are
well
protected
against
damage.
Attention1:
It
is
necessary
to
hold
the
platform
during
the
hoisting
process.
Irrelevant
person
is
not
allowed
in
installation
area.
Step
3:
Connect
hydraulic
oil
hoses.
Screw
torque
for
oil
hose
connector
is
60N*M.
Firstly,
connect
the
oil
hoses
between
the
two
platforms.
And
then,
connect
the
oil
hoses
from
the
main
platform
with
the
tie
‐
ins
remained
on
the
hydraulic
block
in
the
control
cabinet.
Oil
hoses
go
into
the
cabinet
trough
the
holes
remained
at
the
bottom
of
the
cabinet.
Attention:
Connect
as
per
the
marks
on
the
hoses
and
do
not
contaminate
the
hydraulic
components
during
the
connection.
Содержание EE-6605B.PD
Страница 21: ...Installation Operation and Parts Manual EE 6605B PD 21 Floor plan for surface installation...
Страница 22: ...Installation Operation and Parts Manual EE 6605B PD 22 Annex 2 Electrical shcemes and parts list...
Страница 23: ...Installation Operation and Parts Manual EE 6605B PD 23...
Страница 24: ...Installation Operation and Parts Manual EE 6605B PD 24...