Installation, Operation and Parts Manual
EE-62CE-60T
21
Step 13: Trial running.
Get familiar with lift controls by running the lift through a few cycles before loading vehicle on lift.
This step is of particular
importance for it can check if the oil hose is well connected. The connection is qualified when there is no abnormal sound or leakage
after having been tested for 5-6 times.
Vent air remained the oil cylinder.
Screw loose but not remove the nut on top of the oil cylinder and slightly press the UP button until oil gets out. Screw the nut tight
thereafter.
After bleeding, fluid level in power unit reservoir may be down. Add more fluid if necessary to raise lift to full height. It is only necessary
to add fluid to raise lift to full height.
Check the synchronization of lifting carriages.
Ensure the synchronization by adjusting the steel cables at both sides. Make both cables be of the same tightness.
This could be judged by the sound emitted by the safety locking unit during lifting process.
If the lift doesn't raise, the motor may turn in the wrong direction. In such event, interchange wires U, V in the connection box.
Step 14: Fix the covers at both sides of post.
1.Hex socket cylinder head screw M6x12
2. Cover.
Vent air remained in the cylinder
Содержание EE-62CE-60T
Страница 10: ...Installation Operation and Parts Manual EE 62CE 60T 10 3 4 Dimensions Overall height 4451...
Страница 11: ...Installation Operation and Parts Manual EE 62CE 60T 11 Overall height 5051...
Страница 28: ...Installation Operation and Parts Manual EE 62CE 60T 28 Annex 2 Electrical schemes and parts list...
Страница 30: ...Installation Operation and Parts Manual EE 62CE 60T 30...