Installation, Operation and Parts Manual
EE-62CE-60T
25
MAINTENANCE
Following are requirements for routine maintenance. Easy and low cost routine maintenance can ensure the lift work normally and
safely. Frequency of routine maintenance is determined by working condition and frequency.
S/N
Components
Methods
Period
1
Swing arm locking units
Push the UP button to raise the swing arms and check if four
swing arms are locked into position. Add grease in case
necessary.
Every day
2
Rubber contact pads
Inspect the pads and clean off any objects that may cause sliding
or damage
Every day
3
Cylinder and oil hose connectors Inspect to ensure no leakage before using the lift.
Every day
4
Control buttons
Check if control buttons work as "hold- to -run " and check if
they work as the function indicated.
Every day
5
Mechanical safety catch
Check if both mechanical catches can engage and disengage
simultaneously by pushing control buttons.
Every day
6
Limit switch
Push the UP button and inspect and to ensure the lifting
platform stops rising when the switch is activated.
Every day
Содержание EE-62CE-60T
Страница 10: ...Installation Operation and Parts Manual EE 62CE 60T 10 3 4 Dimensions Overall height 4451...
Страница 11: ...Installation Operation and Parts Manual EE 62CE 60T 11 Overall height 5051...
Страница 28: ...Installation Operation and Parts Manual EE 62CE 60T 28 Annex 2 Electrical schemes and parts list...
Страница 30: ...Installation Operation and Parts Manual EE 62CE 60T 30...