Steel cables
$
Check the condition of the steel retaining
cable on the upper conveyor on a daily
basis.
Always replace damaged steel cables
immediately.
Tearing steel cables constitute a serious
threat to man and machine.
Relieve tension on any damaged steel
cables on the upper conveyor and re-
place!
During all work on the upper conveyor,
ensure that the conveyor drive cannot
be started!
Rubber funnel gasket at transfer
point and rubber seals / guides
Various rubber components are located
on the upper conveyor which should pro-
vide problem-free material removal.
These rubber components should be
visually inspected on a weekly basis for
signs of damage.
- Collecting funnel (1)
- Side guide on upper conveyor (2)
All rubber components are fitted using
bolt connections and are easy to remove
if required.
- Dismantle fastening bolts then remove damaged components.
- Fit new component properly then tighten down the fastening bolts.
Haltese l_PL600_new.cdr
Rubber_Pl600.cdr
2
1
Содержание PL 1000 RS
Страница 2: ...VALUE QUALITY THE ORIGINAL Your Authorizied Dynapac Dealer SPARE PARTS...
Страница 10: ......
Страница 26: ...B 14 B_PL1000RS_GB fm 14 18 04 07 5 2 Identification points 8 10 2 2 9 3 7 6 11 4 2 12 1 2 5 25...
Страница 27: ...B 15 B_PL1000RS_GB fm 15 18 04 07 14 14 13 16 16 3 17 20 19 2 2 18 13 21 22 23 24...
Страница 38: ......
Страница 42: ...D 4 D_PL1000RS_GB fm 4 112 04 07 P 0 I I I 8 Panel3_600 cdr A 7 5 3 4 6...
Страница 44: ...D 6 D_PL1000RS_GB fm 6 112 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 46: ...D 8 D_PL1000RS_GB fm 8 112 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 64: ...D 26 D_PL1000RS_GB fm 26 112 04 07 Panel4_1000 cdr D 73 74 70 75 77 78 76 71 72...
Страница 66: ...D 28 D_PL1000RS_GB fm 28 112 04 07 Panel4_1000 cdr D 73 74 70 75 77 78 76 71 72...
Страница 86: ...D 48 D_PL1000RS_GB fm 48 112 04 07 5 Operating the MOBA matic Nivellcompl cdr A C B...
Страница 90: ...D 52 D_PL1000RS_GB fm 52 112 04 07 Moba1can jpg M10 A C M2 M3 M6 M7 M9 M8 M4 M5 M1 M11...
Страница 149: ...D 111 D_PL1000RS_GB fm 111 112 04 07 10 4 MOBA Matic error messages...
Страница 150: ......
Страница 178: ...F 24 F_PL1000RS_GB fm 24 76 04 07 Nivellswitch1000 cdr Moba1a cdr Moba29 jpg Moba21 jpg 8 2 3 4 5 A B C D E 7 9 1 6...
Страница 225: ...F 71 F_PL1000RS_GB fm 71 76 04 07 9 5 Water system Result name signature Comments about scope of work Occasion MH Date...
Страница 228: ......