D 93
D_PL100
0RS_G
B
.f
m
9
3
-1
12
-
04
.0
7
Ending the milling procedure
Stop the machine and raise at the end of the milling lane:
- The drive lever (70) is located in centre position.
- If the automatic levelling device is used for planing, first shut down the levelling unit
using switches (37) and (38).
- Move selector switch for the front board (35) and the moldboard (34) (
&
) to „0“.
- Raise machine uniformly by pressing both switches (73) + (74) together until the
desired ground clearance has been reached. Where applicable, press the switch
for raising and lowering speed (36) to rapid adjustment beforehand.
- Allow milling drum drive (31), water pump (33) and upper conveyor (32) to run on
briefly, then switch to „0“.
- Move switch (38) to transportation speed (hare).
- Set preselector controller for driving speed (27) to around 50%.
- Start to move the machine by deflecting the drive lever out of its centre position and
move out of the construction site area. If necessary, use the preselector controller
(27) to slowly increase the driving speed.
- Where necessary, guide the upper conveyor using the control lever (71).
$
Comply with safety regulations when moving the machine outside the construction
site!
28
27
36
32
35
31
34
33
Panel2_500_1000.wmf/Panel4_1000.bmp
71
70
73
74
38
37
Содержание PL 1000 RS
Страница 2: ...VALUE QUALITY THE ORIGINAL Your Authorizied Dynapac Dealer SPARE PARTS...
Страница 10: ......
Страница 26: ...B 14 B_PL1000RS_GB fm 14 18 04 07 5 2 Identification points 8 10 2 2 9 3 7 6 11 4 2 12 1 2 5 25...
Страница 27: ...B 15 B_PL1000RS_GB fm 15 18 04 07 14 14 13 16 16 3 17 20 19 2 2 18 13 21 22 23 24...
Страница 38: ......
Страница 42: ...D 4 D_PL1000RS_GB fm 4 112 04 07 P 0 I I I 8 Panel3_600 cdr A 7 5 3 4 6...
Страница 44: ...D 6 D_PL1000RS_GB fm 6 112 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 46: ...D 8 D_PL1000RS_GB fm 8 112 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 64: ...D 26 D_PL1000RS_GB fm 26 112 04 07 Panel4_1000 cdr D 73 74 70 75 77 78 76 71 72...
Страница 66: ...D 28 D_PL1000RS_GB fm 28 112 04 07 Panel4_1000 cdr D 73 74 70 75 77 78 76 71 72...
Страница 86: ...D 48 D_PL1000RS_GB fm 48 112 04 07 5 Operating the MOBA matic Nivellcompl cdr A C B...
Страница 90: ...D 52 D_PL1000RS_GB fm 52 112 04 07 Moba1can jpg M10 A C M2 M3 M6 M7 M9 M8 M4 M5 M1 M11...
Страница 149: ...D 111 D_PL1000RS_GB fm 111 112 04 07 10 4 MOBA Matic error messages...
Страница 150: ......
Страница 178: ...F 24 F_PL1000RS_GB fm 24 76 04 07 Nivellswitch1000 cdr Moba1a cdr Moba29 jpg Moba21 jpg 8 2 3 4 5 A B C D E 7 9 1 6...
Страница 225: ...F 71 F_PL1000RS_GB fm 71 76 04 07 9 5 Water system Result name signature Comments about scope of work Occasion MH Date...
Страница 228: ......