D 85
D_PL100
0RS_G
B
.f
m
8
5
-1
12
-
04
.0
7
Once all preparatory work for planing has been completed, the planer is ready for op-
eration and a truck is parked below the upper conveyor to receive cutting debris, the
stationary machine is lowered to the required depth.
- Carefully lower the stationary machine by pressing the switches (74 + 73) until the
milling drum makes gentle contact with the working surface.
- Set the milling depth indicators (A) on both sides of the machine to zero.
- Press the switches (74 + 73) again to lower the machine carefully down to the de-
sired milling depth paying careful attention to the milling depth indicators.
- Set desired milling speed by adjusting the setting of the drive lever (70). The ma-
chine starts to move when the drive lever moves out of its central position.
- If necessary, adjust the speed of the upper conveyor using the preselector (25).
- If necessary, guide the upper conveyor using the control lever (71).
The automatic function for water sprinkling and upper conveyor is engaged as soon
as the drive lever moves out of its central position and is disengaged automatically as
soon as the machine is stopped.
Содержание PL 1000 RS
Страница 2: ...VALUE QUALITY THE ORIGINAL Your Authorizied Dynapac Dealer SPARE PARTS...
Страница 10: ......
Страница 26: ...B 14 B_PL1000RS_GB fm 14 18 04 07 5 2 Identification points 8 10 2 2 9 3 7 6 11 4 2 12 1 2 5 25...
Страница 27: ...B 15 B_PL1000RS_GB fm 15 18 04 07 14 14 13 16 16 3 17 20 19 2 2 18 13 21 22 23 24...
Страница 38: ......
Страница 42: ...D 4 D_PL1000RS_GB fm 4 112 04 07 P 0 I I I 8 Panel3_600 cdr A 7 5 3 4 6...
Страница 44: ...D 6 D_PL1000RS_GB fm 6 112 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 46: ...D 8 D_PL1000RS_GB fm 8 112 04 07 Panel2_500_1000 bmp B 23 24 22 21 20 25 27 26 36 37 38 28 29 30 34 32 33 35 31...
Страница 64: ...D 26 D_PL1000RS_GB fm 26 112 04 07 Panel4_1000 cdr D 73 74 70 75 77 78 76 71 72...
Страница 66: ...D 28 D_PL1000RS_GB fm 28 112 04 07 Panel4_1000 cdr D 73 74 70 75 77 78 76 71 72...
Страница 86: ...D 48 D_PL1000RS_GB fm 48 112 04 07 5 Operating the MOBA matic Nivellcompl cdr A C B...
Страница 90: ...D 52 D_PL1000RS_GB fm 52 112 04 07 Moba1can jpg M10 A C M2 M3 M6 M7 M9 M8 M4 M5 M1 M11...
Страница 149: ...D 111 D_PL1000RS_GB fm 111 112 04 07 10 4 MOBA Matic error messages...
Страница 150: ......
Страница 178: ...F 24 F_PL1000RS_GB fm 24 76 04 07 Nivellswitch1000 cdr Moba1a cdr Moba29 jpg Moba21 jpg 8 2 3 4 5 A B C D E 7 9 1 6...
Страница 225: ...F 71 F_PL1000RS_GB fm 71 76 04 07 9 5 Water system Result name signature Comments about scope of work Occasion MH Date...
Страница 228: ......