A 1
A Correct use and application
A
The "Guidelines for the Correct Use and Application of Paver Finishers" compiled by
Dynapac are included in the scope of delivery for the present machine. The
guidelines are part of the present operating instructions and must always be heeded.
National regulations are fully applicable.
The road construction machine described in these operating instructions is a paver
finisher that is suited for laying mixed materials, roll-down concrete or lean-mixed
concrete, track-laying ballast and unbound mineral aggregates for foundations for
paving.
The paver finisher must be used, operated and maintained according to the
instructions given in the present operating instructions. Any other use is regarded as
improper use and can cause injury to persons or damage to the paver finisher or other
equipment or property.
Any use going beyond the range of applications described above is regarded as
improper use and is expressly forbidden! Especially in those cases where the paver
finisher is to be operated on inclines or where it is to be used for special purposes
(construction of dumps, dams), it is absolutely necessary to contact the manufacturer.
Duties of the user:
A "user" within the meaning of these operating instructions is
defined as any natural or legal person who either uses the paver finisher himself, or
on whose behalf it is used. In special cases (e.g. leasing or renting), the user is
considered to be the person who, in accordance with existing contractual agreements
between the owner and the user of the paver finisher, is charged with the observance
of the operating duties.
The user must ensure that the paver finisher is only used in the stipulated manner and
that all danger to life and limb of the operator, or third parties, is avoided. In addition
to this, it must be ensured that the relevant accident prevention regulations and other
safety-related provisions as well as the operating, servicing and maintenance
guidelines are observed. The user must also ensure that all persons operating the
paver finisher have read and understood the present operating instructions.
Mounting of attachments:
The paver finisher must only be operated in conjunction
with screeds that have been approved by the manufacturer. Mounting or installation
of any attachments that will interfere with or supplement the functions of the paver
finisher is permitted only after written approval by the manufacturer has been
obtained. If necessary, the approval of local authorities must be obtained.
Any approval obtained from local authorities does not, however, make approval by
the manufacturer unnecessary.
Содержание F1200C
Страница 2: ...www dynapac com...
Страница 10: ...8...
Страница 24: ...A 2...
Страница 31: ...B 7 4 Safety devices 4 5 6 7 8 8 2 1 9 3 10...
Страница 34: ...B 10 5 2 Permissible approach angle max 15 max 10...
Страница 40: ...B 16 8 6 3 5 7 41 24 14 10 20 15 19 3 6 8 14 18 17 16 21 13 11 23 22 41 5 4 14 12 60 1 40 2 42 o...
Страница 41: ...B 17 xxxxxxxxxxxxxxxxx 32 30 31...
Страница 52: ...B 28...
Страница 74: ...C 10 12 22...
Страница 78: ...D 10 12 4 15 16 18 14 13 17 12 11 10 10 19...
Страница 80: ...D 10 12 6 15 16 18 14 13 17 12 11 10 10 19...
Страница 82: ...D 10 12 8 15 16 18 14 13 17 12 11 10 10 19...
Страница 84: ...D 10 12 10 21 20 23 22...
Страница 86: ...D 10 12 12 25 24 27 26...
Страница 88: ...D 10 12 14 25 24 27 26...
Страница 90: ...D 10 12 16 29 30...
Страница 92: ...D 10 12 18 32 31...
Страница 94: ...D 10 12 20 33...
Страница 96: ...D 10 12 22 35 34...
Страница 98: ...D 10 12 24 36 38 37...
Страница 100: ...D 10 12 26 40 39...
Страница 102: ...D 10 12 28 42 41...
Страница 104: ...D 10 12 30 44 43...
Страница 106: ...D 10 12 32 45...
Страница 108: ...D 10 12 34 51 56 58 57 59...
Страница 110: ...D 10 12 36 51 56 58 57 59...
Страница 112: ...D 10 12 38 Flame monitoring o 73 71 72 70...
Страница 114: ...D 10 12 40 77 74 75 76...
Страница 118: ...D 10 12 44 95 90 91 92 93 94...
Страница 120: ...D 10 12 46 95 90 91 92 93 94...
Страница 122: ...D 10 12 48 4 Remote control 103 104 101 106 100 102 105 107 108 109...
Страница 124: ...D 10 12 50 103 104 101 106 100 102 105 107 108 109...
Страница 126: ...D 10 12 52 103 104 101 106 100 102 105 107 108 109...
Страница 128: ...D 10 12 54 103 104 101 106 100 102 105 107 108 109...
Страница 130: ...D 10 12 56 5 Malfunctions 5 1 Error code query for engine 3 1 2...
Страница 144: ...D 30 12 12 m Tighten all assembly parts properly after setting up...
Страница 152: ...D 30 12 20...
Страница 157: ...D 40 12 5 1 3 7 8 6 6 7 7 6 2 4 9 5...
Страница 160: ...D 40 12 8 1 3 7 8 6 6 7 7 6 2 4 9 5...
Страница 163: ...D 40 12 11 1 2...
Страница 165: ...D 40 12 13 6 1 2 3 4 5...
Страница 167: ...D 40 12 15 4 6 6 6 1 2 5 3...
Страница 171: ...D 40 12 19 2 3 2 2 1 4...
Страница 173: ...D 40 12 21 1 8 9 8 8 6 4 2 3 5 7 10 13 11 12...
Страница 176: ...D 40 12 24 1 2...
Страница 178: ...D 40 12 26 1 4 5 10 10 7 3 2 9 6 8 12 10 13 14 16 15 11 4 4 11 11...
Страница 186: ...D 40 12 34...
Страница 203: ...F 2 12 1 F 2 12 Maintenance review 1 Maintenance review 8 12 4 12 5 12 3 12 7 12 6 12 11 12 100 02...
Страница 205: ...F 3 12 1 F 3 12 Maintenance conveyor 1 Maintenance conveyor...
Страница 211: ...F 4 12 1 F 4 12 Maintenance auger assembly 1 Maintenance auger assembly...
Страница 233: ...F 6 12 1 F 6 12 Maintenance hydraulic system 1 Maintenance hydraulic system...
Страница 247: ...F 7 12 1 F 7 12 Maintenance drive unit 1 Maintenance drive unit...
Страница 260: ...F 7 12 14...
Страница 261: ...F 8 12 1 F 8 12 Maintenance electrical system 1 Maintenance electrical system...
Страница 276: ...F 8 12 16...
Страница 278: ...F 11 12 2 2 7 1 3 5 6 6 4...
Страница 284: ...F 11 12 8...
Страница 285: ...F 100 1 F 100 Tests stopping 1 Tests checks cleaning stopping...
Страница 294: ...F 100 10...
Страница 296: ...www dynapac com...