5.
Unscrew the fastening screws (1).
6.
Remove the valve cover (2) with gasket.
Valve clearance:
Intake valve (IN)
0.20 mm (0.008 in)
Exhaust valve (EX)
0.20 mm (0.008 in)
1.
Crank the engine, until the exhaust valve (EX) is fully open.
2.
Check the valve clearance on the intake valve (IN) with a
feeler gauge (1), adjust if necessary.
3.
Crank the engine further, until the intake valve is fully open.
4.
Check the valve clearance on the exhaust valve, adjust if
necessary.
1.
Loosen screw (3) on the rocker arm.
2.
Adjust the hexagon nut (2), until the feeler gauge (1) can be
inserted and pulled out with noticeable resistance after the
screw (3) has been tightened.
Fig. 65
Checking the valve clearance
Fig. 66
Adjusting the valve clearance
Fig. 67
Maintenance – Annually
DFP12D
78
Содержание DFP12D
Страница 2: ...2...
Страница 6: ...Table of contents DFP12D 6...
Страница 7: ...1 Introduction Introduction DFP12D 7...
Страница 11: ...2 Technical data Technical data DFP12D 11...
Страница 15: ...3 Concerning your safety Concerning your safety DFP12D 15...
Страница 35: ...Brief operating instructions Fig 15 Concerning your safety Signage DFP12D 35...
Страница 37: ...4 Indicators and control elements Indicators and control elements DFP12D 37...
Страница 42: ...Indicators and control elements Transport wheels DFP12D 42...
Страница 43: ...5 Checks prior to start up Checks prior to start up DFP12D 43...
Страница 50: ...Checks prior to start up Checking the water level topping up DFP12D 50...
Страница 51: ...6 Operation Operation DFP12D 51...
Страница 59: ...7 Loading transporting the machine Loading transporting the machine DFP12D 59...
Страница 64: ...Loading transporting the machine Transport wheels DFP12D 64...
Страница 65: ...8 Maintenance Maintenance DFP12D 65...
Страница 90: ...Maintenance As required DFP12D 90...
Страница 91: ...9 Troubleshooting Troubleshooting DFP12D 91...
Страница 95: ...10 Disposal Disposal DFP12D 95...
Страница 97: ......
Страница 98: ......