Machine description
4812160801_D.pdf
2018-12-17
Instruments/Controls
Locations - Instruments and controls
Fig. Instruments and control panel
12.
Manual/automatic sprinkler
17.
*
Hazard beacon
12.
Manual/automatic sprinkler
17.
*
Hazard beacon
13.
*
Sprinkler timer
18.
*
Direction indicators
13.
*
Sprinkler timer
18.
*
Direction indicators
14.
*
Road lights
19.
Horn
14.
*
Road lights
19.
Horn
15.
Working lights
20.
Vibration manual/automatic
15.
Working lights
20.
Vibration manual/automatic
16.
*
Hazard warning lights
21.
*
Vibration selector Front/rear drum
16.
*
Hazard warning lights
21.
*
Vibration selector Front/rear drum
22.
Control panel
22.
Control panel
*
= Option
31.
Parking brake On/Off
*
= Option
31.
Parking brake On/Off
31
12
13
14
15
16
17
18
19
20
21
22
29
Содержание CC1000
Страница 2: ......
Страница 12: ...Introduction 4812160801_D pdf 2018 12 17 4 ...
Страница 20: ...Special instructions 4812160801_D pdf 2018 12 17 12 ...
Страница 28: ...Technical specifications 4812160801_D pdf 2018 12 17 20 ...
Страница 54: ...Operation 4812160801_D pdf 2018 12 17 46 ...
Страница 64: ...Operating instructions Summary 4812160801_D pdf 2018 12 17 56 ...
Страница 66: ...Preventive maintenance 4812160801_D pdf 2018 12 17 58 ...
Страница 70: ...Maintenance Lubricants and symbols 4812160801_D pdf 2018 12 17 62 ...
Страница 77: ...Maintenance Maintenance schedule 4812160801_D pdf 2018 12 17 Service Checklist 69 ...
Страница 78: ...Maintenance Maintenance schedule 4812160801_D pdf 2018 12 17 70 ...
Страница 86: ...Maintenance 10h 4812160801_D pdf 2018 12 17 78 ...
Страница 116: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com ...