Machine description
4812164901_A.pdf
2022-11-14
First charging procedure
NOTE Battery pack is not fully charged when the
machine is sent from the factory. Battery pack needs
to be charged before the first use.
Use designated chargers only. See section
Chargers.
Use designated chargers only. See section
Chargers.
Use only one charger at a time.
Use only one charger at a time.
1. Insert plug to machine charging port and plug in the
charger.
NOTE Charging starts automatically if the batteri is
initiated.
2. Charge the battery to a full 100% SOC.
Dismounting and disposal
Disconnecting the battery system
1. Shut down the machine.
Fig. Disconnecting cables
2. Disconnect the battery system from charger.
3. Disconnect the cables from positive power terminal
(1), negative power terminal (2), and signal interface
terminal (3).
Make sure that the external cabling between
battery system and machine frame is not cut or
damaged during dismounting to prevent external
short circuit.
Make sure that the external cabling between
battery system and machine frame is not cut or
damaged during dismounting to prevent external
short circuit.
50
Содержание CC1000 e
Страница 2: ......
Страница 10: ...e 4812164901_A pdf 2022 11 14...
Страница 28: ...Technical specifications 4812164901_A pdf 2022 11 14 18...
Страница 66: ...Machine description 4812164901_A pdf 2022 11 14 56...
Страница 82: ...Operation 4812164901_A pdf 2022 11 14 72...
Страница 92: ...Operating instructions Summary 4812164901_A pdf 2022 11 14 82...
Страница 94: ...Operating instructions Summary 4812164901_A pdf 2022 11 14 84...
Страница 96: ...Preventive maintenance 4812164901_A pdf 2022 11 14 86...
Страница 108: ...Maintenance 50h 4812164901_A pdf 2022 11 14 98...
Страница 112: ...Maintenance measures every other month 4812164901_A pdf 2022 11 14 102...
Страница 118: ...Maintenance measures 500 h 4812164901_A pdf 2022 11 14 108...
Страница 129: ......
Страница 130: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com...