Operation
ICA250i-IN2EN1.pdf
2012-12-19
Switching off
1
22
9
Fig. Instrument panel
1. Starter switch
9. Instrument guard
22. Panel for warning lamps
Check instruments and warning lamps to see if any
faults are indicated. Switch off all lights and other
electrical functions.
Turn the starter switch (1) to the left to switched off
position 1. At the end of the shift, lower the instrument
cover (22) and lock it.
Parking
Master switch
1
Fig. Engine compartment
1. Master switch
Before leaving the roller for the day, switch the master
switch (1) to the disconnected position and remove the
key.
This will prevent battery discharging and will also
make it difficult for unauthorized persons to start and
operate the machine. Also lock the engine hood.
37
Содержание CA250 i
Страница 2: ......
Страница 18: ...Special instructions ICA250i IN2EN1 pdf 2012 12 19 10...
Страница 36: ...Machine description ICA250i IN2EN1 pdf 2012 12 19 28...
Страница 56: ...Operating instructions Summary ICA250i IN2EN1 pdf 2012 12 19 48...
Страница 58: ...Preventive maintenance ICA250i IN2EN1 pdf 2012 12 19 50...
Страница 80: ...Maintenance 250h ICA250i IN2EN1 pdf 2012 12 19 72...
Страница 92: ......
Страница 93: ......