Installation, Operation and Service Manual
LKP Series
© 2016 DynAmp, LLC
Page
041749 K
ix
REVISION PAGE
Page
Change
Reason For Revision
Date
all
Rev NEW
9/97
all
Rev A
Added LKP-400 information, updated LKP-180 & 300
Drawings
7/98
all
Rev B
Updated mounting instructions, accuracy diagnostics
information, and wiring diagrams.
8/99
i,
Rev C
Warranty, Installation Considerations
03/00
i,7,34
Rev D
Warranty & paragraph in Installation for OP’s check,
Spare Parts
08/00
27, 34
Rev E
Updated Accuracy Diagnostics, Spare Parts sections
02/02
iii, 7
Rev F
Updated Warranty and Installation paragraph
10/03
all
Rev G
Update to DynAmp, LLC
12/04
v, 1, 32,
34
Rev H
Update fuse precautions per ECR 1304
07/06
39
Rev I
ECO 3166 update accuracy diagnostics drawings/list
09/08
all
Rev J
PAR 10245 – Handling & Storage, ECR 1440- Calibration
Intervals / New Manual Format
06/11
1,2,11,19
Rev K
ECO 3307 – Section 1 Safety, Installation Precautions,
Metering Unit Wiring
10/16