Issue: 16.08.2010
Instruction Manual DVZ-SKA “BIOMASTER“-PLUS
Page 18 of 39
6.2 SET UP FOR OPERATION
The system should be set up for normal, automatic operation as specified below. If
starting up the unit new or after shutdown, refer to section „SART UP“. The Contact tank
must be about half full as indicated by Contact tank sight glass.
6.3 VALVE SETTINGS FOR OPERATION
Discharge valves
Function
Valve setting
H7
H5
H4
H12
Discharge of sludge from pre-treatment
tank
open
close
close
Turne to
over-
board
Discharge of sludge from Treatment
Tank
close
open
close
Turne to
over-
board
Discharge of disinfecting tank
close
close
open
Turne
to
over-
board
All valves must be either fully opened or fully closed.
6.4 CONTROL SETTINGS
Switch
Position
Main circuit breaker
ON
Blower
Push ON to start
Pump
AUTO
H7
H5
H4
H12
Содержание Biomaster PLUS Series
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 19: ......
Страница 21: ......
Страница 22: ......
Страница 23: ......
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 27: ......
Страница 28: ......
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 83: ...Issue 16 08 2010 Instruction Manual DVZ SKA BIOMASTER PLUS Page 33 of 39...
Страница 88: ...Issue 16 08 2010 Instruction Manual DVZ SKA BIOMASTER PLUS Page 38 of 39 SCHNITTBILD SECTION DRAWING...
Страница 89: ...Issue 16 08 2010 Instruction Manual DVZ SKA BIOMASTER PLUS Page 39 of 39...