Issue: 04.05.2011
DVZ-SKA-”BIOMASTER”-PLUS – Pump P2
Page 9 of 6
SKA-PLUS-ANNEX P2-Eng
Figure 6: Clamp set assembly
- Correct positioning of the clamp set (123) on the hollow
shaft (125) must be checked, in accordance with Figure
6, item X.
- Pull the splash ring (123) onto the clamp set (123) (please
see Section Assembly of the rotor and the joints).
Installation of the rotor and the joint
- Drive the guide bushes (303) halfway into the rotor (401)
and the hollow shaft (125) using a tapered brass drift.
- Push clamping bands (306), cover sleeves (308) and
retaining sleeve (304) onto the shaft of the coupling rod
(307).
- Push the coupling rod (307) into the head of the rotor
(401) or the hollow shaft (125).
- Push coupling rod pins (301) into the coupling rod bush
(302) and drive in guide bushes (303) completely.
- If necessary, emery the outside of the retaining sleeve
(304) and pull it over the head of the rotor (401) or the
hollow shaft (125).
- After installing the retaining sleeve (304), secure it against
axial movement on the head of the rotor (401) or hollow
shaft (125).
ATTENTION:
To do this, drive the face of the retaining
sleeve (304) into the groove on the head of the rotor
(401) or hollow shaft (125) using a centre punch (see
Figure 7).
Figure 7: Securing the retaining sleeve
- Raise the cover sleeve (308) by lifting at the top with a
screwdriver, guide the oil can spray pipe beneath the
sleeve, and fill the joint area with special joint oil Type
B or ET 1510 ISO 460 oil.
- Check that the bent loop of the clamping band (306) is
resting against the clamping band lock. If not, press it
against the lock with a pair of standard flat pliers (see
Figure 8).
Figure 8: Press bent loop of clamping band against the
clamping band lock.
- Place the clamping bands (306) in the grooves of the
cover sleeve (308) and tighten.
Installation of the stator
- Before installation, lubricate the stator (402) and rotor
(401) with a sliding agent (silicon oil, Polydiol, soft
soap or similar).
ATTENTION:
Do not use ordinary oil.
- For plastic or metal stators, insert stator gaskets (403)
and (404).
Note: With plastic stators, the stator gasket (403) and
the O-ring must always be located on the discharge
side.
- Pull the stator (402) over the rotor (401).
Note: If difficulty is experienced, rotate the stator
(402) at the same time, using a chain wrench. Secure
the hollow shaft (125) in order to do this.
- Bolt together the discharge casing (504), the stator
(402) and the suction casing (505) with the
connecting bolts (611) and hexagon nuts (609).
Uniformly tighten the hexagon head bolts.
Содержание Biomaster PLUS Series
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 19: ......
Страница 21: ......
Страница 22: ......
Страница 23: ......
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 27: ......
Страница 28: ......
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 83: ...Issue 16 08 2010 Instruction Manual DVZ SKA BIOMASTER PLUS Page 33 of 39...
Страница 88: ...Issue 16 08 2010 Instruction Manual DVZ SKA BIOMASTER PLUS Page 38 of 39 SCHNITTBILD SECTION DRAWING...
Страница 89: ...Issue 16 08 2010 Instruction Manual DVZ SKA BIOMASTER PLUS Page 39 of 39...