Needle bar
38
Service Instructions 755 A/756 A - 00.0 - 02/2019
Fig. 27: Assembling the needle bar linkage (3)
7. Push the pin completely into lever (7) and then further into lever (11).
8. Tighten the screws (10).
The thread lever (8) must be able to move freely.
The thread lever (8) is automatically positioned correctly when the
screws (9) on the face of the pin have been tightened.
9. Slightly loosen the screws (9) and slowly complete 2-3 turns at the
handwheel.
The components are released from tension mechanically.
10. Tighten the screws (9).
11. Tie the oil wick (3) to the felt (2).
Fig. 28: Assembling the needle bar linkage (4)
(7)
- Lever
(8)
- Thread lever
(9)
- Screws
(10) - Screws
(11) - Lever
⑪
⑦
⑨
⑩
⑧
(12) - Screw
(13) - Gear tongues
⑫
⑬
Содержание 755 A
Страница 1: ...755 A 756 A Service Instructions...
Страница 8: ...Table of Contents 6 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 12: ...About these instructions 10 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 116: ...Folder 114 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 124: ...Transport carriage 122 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 138: ...Transport clamps 136 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 200: ...Light barriers 198 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 222: ...Endless zipper feed optional 220 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 238: ...Additional equipment 236 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 266: ...Stacker 264 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 438: ...Programming 436 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 450: ...Decommissioning 448 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 452: ...Disposal 450 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 472: ...Technical data 470 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 496: ...Appendix 494 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 497: ......