Programming
Service Instructions 755 A/756 A - 00.0 - 02/2019
367
2. Enter the desired value using the numeric keypad.
3. Confirm with
OK
.
Test roll-off device
The display switches to
Test roll-off device
.
Fig. 337: Testing roll-off device
To test the roll-off device:
1. Press the desired button.
2. Enter the desired value using the numeric keypad.
3. Confirm with
OK
.
Symbols
Meaning
Set roll-off speed
• 1 - 15
Test duration of roll-off device
• 0 ms - 1000 ms
Start roll-off test
Roll-off On/Off
Содержание 755 A
Страница 1: ...755 A 756 A Service Instructions...
Страница 8: ...Table of Contents 6 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 12: ...About these instructions 10 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 116: ...Folder 114 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 124: ...Transport carriage 122 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 138: ...Transport clamps 136 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 200: ...Light barriers 198 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 222: ...Endless zipper feed optional 220 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 238: ...Additional equipment 236 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 266: ...Stacker 264 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 438: ...Programming 436 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 450: ...Decommissioning 448 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 452: ...Disposal 450 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 472: ...Technical data 470 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 496: ...Appendix 494 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 497: ......