
Transport carriage
Service Instructions 755 A/756 A - 00.0 - 02/2019
117
Proper setting
Dimensional check for the front edge of the transport clamp:
To set the front end position of the transport carriage:
1. Open the menu
Service > Global parameters >
Set positioning point > front positioning point
and set the value to 111 mm (
1. Press the
button.
Reference run is carried out.
The transport clamp moves to the rear end position.
2. Press the pedal.
The transport clamp moves to the front end position.
3. Check the dimension for the front edge of the transport clamp.
4. Switch off the machine.
5. Shift the position of the reference switch (1) in the slotted hole to
correct the calculated difference.
6. Switch on the machine.
7. Press the
button.
Reference run is carried out.
8. Check the dimension for the front edge of the transport clamp.
front positioning point + length of transport clamp +
projection of the transport clamp after the end
of the seam
Distance between
the needles and
the front edge of
the transport clamp
111 mm + 180 mm + 15 mm
306 mm
91 mm + 200 mm + 15 mm
306 mm
123 mm + 240 mm +15 mm
378 mm
143 + 220 + 15 mm
378 mm
Содержание 755 A
Страница 1: ...755 A 756 A Service Instructions...
Страница 8: ...Table of Contents 6 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 12: ...About these instructions 10 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 116: ...Folder 114 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 124: ...Transport carriage 122 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 138: ...Transport clamps 136 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 200: ...Light barriers 198 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 222: ...Endless zipper feed optional 220 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 238: ...Additional equipment 236 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 266: ...Stacker 264 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 438: ...Programming 436 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 450: ...Decommissioning 448 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 452: ...Disposal 450 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 472: ...Technical data 470 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 496: ...Appendix 494 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 497: ......