Stacker
Service Instructions 755 A/756 A - 00.0 - 02/2019
259
Replacing pneumatic cylinder 2
Fig. 255: Replacing pneumatic cylinder 2
To replace pneumatic cylinder 2:
1. Loosen the spring clip (1).
2. Loosen the screw (2) and disassemble the axle.
3. Disassemble the old pneumatic cylinder.
4. Set the new pneumatic cylinder to a dimension of 240 mm.
5. Assemble the new pneumatic cylinder.
Make sure to insert the sockets again.
6. Connect the pneumatic lines.
(1)
- Spring clip
(2)
- Screw
②
①
240 (retracted)
Содержание 755 A
Страница 1: ...755 A 756 A Service Instructions...
Страница 8: ...Table of Contents 6 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 12: ...About these instructions 10 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 116: ...Folder 114 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 124: ...Transport carriage 122 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 138: ...Transport clamps 136 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 200: ...Light barriers 198 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 222: ...Endless zipper feed optional 220 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 238: ...Additional equipment 236 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 266: ...Stacker 264 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 438: ...Programming 436 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 450: ...Decommissioning 448 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 452: ...Disposal 450 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 472: ...Technical data 470 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 496: ...Appendix 494 Service Instructions 755 A 756 A 00 0 02 2019...
Страница 497: ......