background image

11

11

11

TIMBER FRAME - ASSEMBLE FRAME

•  Stand up back wall frame and one end wall frame.

•  Using a 10mm drill, predrill and screw both frames 

together using four 100mm tek screws per corner. 

(100mm down from top and 100mm up from base 

and remaining screws evenly spaced in between.)

•   Ensure end wall panels fi t in between front and back 

frames.

•  Repeat with remaining frames untill all frames are 

screwed together.

•  Position ridge beams onto top plates, ensuring they 

are directly above studs.

•  Using two 90mm nails, skew nails to top plate.

•  Using four 55mm tek screws, screw bracket to 

underside of ridge beam and studs as shown.

•  Position frame onto base (either concrete,plywood or 

timber fl oor).

•  Ensure frame is straight and check that frame is 

square by ensuring diagonal measurements are the 

same.

•  Screw base plate to fl oor using 100mm tek screws 

or 100mm dyna bolts - two on front wall and four on 

remaining walls as shown.

•  Using a hand saw, remove base plate between door 

studs by cutting fl ush with inside of door studs as 

shown.

•  (Note - you may choose to leave base plate attached, 

if your shed does not have a fl oor).

•  If your shed has an optional timber or ply fl oor, attach 

door step fl ashing now. Predrill and nail through top 

of fl ashing, using three 50mm fl ooring nails

CUT

CUT

SECURE FRAME TO FLOOR

.

.

.

.

..

.

.

..

.

.

.

.

Tek screw/Dynabolts

Содержание MARLBOROUGH

Страница 1: ...MARLBOROUGH...

Страница 2: ...nd ears Use electronic tools with care Use a Safety Trip Switch It is easier and quicker if this shed is erected by two people SELECT YOUR SITE Your shed must be level Achieve this by either levelling...

Страница 3: ...45 2 400m 1 Stud 70 x 45 Yellow 2 295m 12 Stud 70 x 45 Yellow 2 440m 6 Stud 70 x 45 Yellow 0 320m 3 Nog 70 x 45 0 990m 3 Nog 70 x 45 0 943m 6 Nog 70 x 45 0 240m 2 Ridge Beam 140 x 45 H1 with 92mm notc...

Страница 4: ...ng 2 125m 2 1006 Downpipe Cover Flashing 2 200m 1 1007 Barge Flashing 3 825m 2 1008 Front Spouting 3 255m 1 1009 Back Spouting 3 255m 1 1010 Spouting End Cap 0 120m 2 1011 4 DESCRIPTION LENGTH QTY DIA...

Страница 5: ...LEAR ROOF DESCRIPTION LENGTH QTY DIAGRAM CHECKED Clear Roof Panel 3 750m 1 PLY FLOOR DESCRIPTION LENGTH QTY DIAGRAM CHECKED Plywood 17mm treated 1 565m x 1 200m 4 Plywood 17mm treated 1 565m x 0 730m...

Страница 6: ...concrete base we recommend the following Concrete base should be 3130mm x 3130mm this is 20mm smaller than the shed frame size which allows for a 10mm gap around the perimeter of the shed Concrete bas...

Страница 7: ...nailing joists together with two 90mm nails per join 7 3040mm 532mm 555mm 555mm 555mm 662mm 1520mm 1520mm C L 3130mm SUB FLOOR FRAME PLYWOOD SHOWING SCREWS Screws 1565mm 1565mm 1200mm 1200mm 730mm Scr...

Страница 8: ...re flush with joists Make sure floor is level and joists are well supported SUB FLOOR FRAME TIMBER SHOWING NAILS Layout remaining floor boards Measure diagonals to ensure measurements are equal and fl...

Страница 9: ...op Plates 8 x 2295mm Studs 6 x 943mm Nogs Select one 3010mm base plate Green one 3010mm top plate Red and four studs Yellow Lay out plates and four studs on a flat surface and nail together using two...

Страница 10: ...6 x 2440mm Studs 3 x 320mm Studs 2 x 240mm Nogs Select one 3150mm base plate Green one 3150mm top plate Red and four studs Yellow Lay out plates and two studs on a flat surface and nail together usin...

Страница 11: ...s screw bracket to underside of ridge beam and studs as shown Position frame onto base either concrete plywood or timber floor Ensure frame is straight and check that frame is square by ensuring diago...

Страница 12: ...round you wont need to attached DPC on the base plate Using ten 30mm clouts attach 75mm wide DPC membrane to each corner as shown DPC should be level with top of top plate and botom of base plate Repe...

Страница 13: ...filings between two sheets Remove all metal filings before riveting Carbon in pencils reacts with the Zinc Aluminium coating on steel Use ink to mark steel CLADDING DETAIL Side View CLADDING DETAIL Ov...

Страница 14: ...ensuring the ends of sheet are flush or parallel with stud Position 2nd sheet underneath the first sheet repeat above Make sure the above sheet is always overlapped correctly Using four 25mm tek screw...

Страница 15: ...top of flashings are level with top of top plate Position door jamb flashing so top is level with underside of lintel Using tin snips knotch bottom of flashing around concrete or ply floor if require...

Страница 16: ...c dropper to underside of spouting Silicone both end caps and plastic dropper to back spouting to ensure there are no leaks Nail assembled spouting to top of back top plate using four 30mm clouts as s...

Страница 17: ...s rear spouting as shown Using one 55mm tek screw screw roof sheet to front top plate Ensure roofing screw is screwed through the top of the crest on corrugate profile See roof fixing pattern below Re...

Страница 18: ...fit into front spouting Using tin snips trim 100mm off bottom fold at the rear of both barges to allow barge to fit into rear spouting It is easier to temporary position barge and mark barge before c...

Страница 19: ...hand side C 2 Steel locking bars D 2 SMALL PARTS BAG CONTAINING Guide clips door size dependent E 4 10 Door handle and fixing to suit F 1 Bottom rail stops and 6mm screws G 2 Faceplate and lock assemb...

Страница 20: ...sed across the opening to avoid gaps MEASUREMENTS Opening width As the standard door overlaps each side by 30mm or more the door should be 60mm wider than the 2400mm opening Opening height The door op...

Страница 21: ...with handle 80 80 HEADROOM REQUIREMENTS FOR DOORS Headroom A minimum of 410mm of headroom is required If the door is installed lower into the opening than shown below additional loss of door opening...

Страница 22: ...NSTALL SECOND BRACKET Using a water level or level straight edge mark the position for the second bracket Re check levels then drill and fix as with first bracket PLACE DOOR ON BRACKET Do not cut plas...

Страница 23: ...h the axle forward in the slots toward the opening and tighten the nuts firmly without overtightening TENSION THE SPRINGS Ensure that the bottom rail is at the 3 o clock position as shown Ensure both...

Страница 24: ...that is level with the brackets B Slide four guide clips E into each guide C Position the bottom clip 200mm from the floor with the rest evenly spaced along the guide Position one guide over the edge...

Страница 25: ...rews With the door in the closed position slide the end of the locking bars through the locking bar retainers and while holding the bars level mark the side of the guides Drill and file out a rectangu...

Страница 26: ...Lock bar cover J WARNING Locking bar covers must be installed to prevent possible finger entrapment CLEAN UP Remove all swarf drill filings with a soft brush or rag Hose down roof and walls thoroughl...

Страница 27: ...caution b With a person at each end of the door hold the axle firmly with a large pip wrench Stillson at least 450mm long c Loosen the U bolt nuts at both ends and KEEP A FIRM GRIP ON WRENCH d Move th...

Страница 28: ...ercially available today However all exposed surfaces require some attention to guard against the premature onset of corrosion and any other harmful atmospheric effects In our atmosphere there are har...

Страница 29: ...ose the door should be about the same if door has an automatic opener put into manual mode before testing door If the door is difficult to operate in either direction up or down then check 1 that the...

Страница 30: ...ding fail to perform as specified above the liability of Riverlea Group Ltd shall in all cases be limited to replacing or repairing the defective product The balance of the original warranty will cove...

Отзывы: