15
15
15
FLASHINGS
• Centralise front top plate fl ashing on top of top plate
and attach fl ashing with four 30mm clouts to top
plate.
• Screw corner fl ashings onto each corner, using six
55mm tek screws per corner. Top screws should be
approx 250mm down from top of top plate.
• Ensure corner fl ashings are square and parallel with
walls panels.and top of fl ashings are level with top of
top plate.
• Position door jamb fl ashing, so top is level with
underside of lintel.
• Using tin snips, knotch bottom of fl ashing around
concrete or ply fl oor if required.
• Attach using three 30mm clouts, nailed to inside of
stud and three 55mm tek screws, screwed through
front wall cladding into stud.
• Position door top fl ashing into position. (Note fl ashing
length will protrude approx 10mm past outside edge
of each door jamb fl ashing).
• Using three 55mm tek screws,(one each end and one
in middle) screw fl ashing to lintel.
Содержание MARLBOROUGH
Страница 1: ...MARLBOROUGH...