All dimensions are approximate and subject to the limitations of the material used and the methods of manufacture
Page 21
2x
HN.3000
2x
HN.2000
4x
ZN.1670.A
4x
J.1960
2x
Z.195.A
Roof installation
IMPORTANT - Ensure the cabin has been built square and level,
otherwise you may experience difficulties.
FASCIA BOARDS
Remember to pre-drill all the holes!
Connect the wind brace (J.1960 - may require to be cut to suit)
& the fascia board using 35mm screws
Ensure both components are flush on the top
Fix fascia boards to the ends of the purlins using 50mm screws
EAVES EDGING
Eaves edging is usually supplied in 2m and 3m lengths
and may require to be cut to suit
Use 35mm screws to fix them to the roof edge reinforcement.
Always pre-drill the holes!
Ensure it is flush with the roof boards on the top and at both ends
Fascia
board
Wind
brace
Eaves edging
Fix the Trapezoid Finials to the Fascia Boards using 50mm screws
Please refer to the "Felt installation" or "Shingles installation" section
at the back of this manual before the following steps.
IMPORTANT - To fit and adjust door sashes please refer to
the "Door" section at the back of the manual.
HN.2000
Z.195.A
ZN.1670.A
J.1960 (cut)
HN.3000 (cut)
J.1960 (cut)
ZN.1670.A
Z.195.A
ZN.1670.A
J.1960 (cut)
HN.2000
HN.3000 (cut)
ZN.1670.A
J.1960 (cut)