5
4.2.- RECEIVER
assembly process,
keep
the work area free
and wear
Make sure that the crane is stopped for the entire duration of
the
protective clothing.
Park the crane and position stop-ends (if
these
are
not
available use appropriate signs) at a suitable distance so that
other cranes on the same runway do not hit it.
Check the power-supply voltage and turn off the mains switch.
Remember that the receiver has several voltage-powered
circuits. Even when the power has been cut off, there is still a
risk of electrical shocks.
Find a suitable location for the receiver with easy access, in a place designated
for reception of the radio transmitter signal, and away from any intense radio
electric disturbance sources.
Install the receiver cabinet using 4 elastic absorbers.