STEAM INJECTION INSTALLATION, OPERATION, AND MAINTENANCE MANUAL
8. Install control tubing (pneumatic) or wiring (electric) to
valve actuator.
9. Install an airflow proving switch to prevent the valve from
opening unless air is moving in duct. See “Humidifier
placement” on Pages 6 – 8 for location
recommendations.
10. Install a duct-mounted high-limit humidistat downstream
from the humidifier. Set humidistat at 80-90% RH
to prevent condensation forming in the duct. Mount
this humidistat far enough downstream to ensure that
injected steam has been completely absorbed before
the humidistat. See “Humidifier placement” on Pages
6 – 8 for location recommendations.
11. Install a temperature switch to prevent possible cold-start
dripping when steam pressure to the humidifier is cycled.
See “Temperature switches” on Pages 16 – 19 for
more information.
12. Install the humidistat and/or sensors according to the
Installation
MINI-BANK HUMIDIFIER
Table 46-1:
Mini-bank humidifier specifications
Face height
Required number of tubes
Face width
Shipping weights
inches
mm
6-9
150-230
2
6" to 48" in 1/2" increments
(150 mm to 1220 mm in 13-mm increments)
For face dimensions larger than 48" × 24" (w x h)
(1220 mm x 610 mm), use Multiple-tube humidifier.
Tubes:
0.3 lbs per tube foot
(0.4 kg per tube meter)
Remaining components
(separator, valve, traps, etc.): 8.5 lbs
(3.8 kg)
10-12
250-305
3
13-15
330-380
4
16-18
405-460
5
19-21
480-535
6
22-24
560-610
7
Note: See Figure 47-1 for face height and face width.
mc_081108_1455