English
7
2. Shoulder band
Nozzle assembling
First ensure that the gasket is put in place,
screw the lance into the grip, and tandem nozzle
head into the lance. In that step, check the
gasket in place to prevent water leakage, and
then tighten the screw securely. Be sure to
tighten it while refraining the excessive
tightening, which will cause the gasket to stick
out.
2. handling and operating method
Adjust the band length as follows:
(1) To shorten the band
Pull the sling downward along the front hanging band.
(2) To lengthen the band
insert the front handing band upward.
Checking the battery remainder
Battery remainder determination method
1. Pour approximately 1 liter of water into the chemical tank.
2. Turn the switch ON, wait until the pump sucks water to raise the pressure, and then check the
graduation of the battery balance meter.
Lance
Gasket (Lance end)
Gasket (Grip end)
Grip
Tandem
nozzle head
Green
Yellow
Red
Operation ready. 2 lamps turn on with battery
fully charged. The lamp will change from on,
flashing, to off as the remaining battery charge
depleted.
Recharge the battery.
Automatic stoppage. Recharge the battery.
–
Be sure to pour water in the chemical tank before inspection. Otherwise, the pump runs
without load and causes a failure.
–
Make it a rule to recharge the battery if the pointer approaches the yellow zone, even if it is
still in the green zone.
CAUTION
Green
Yellow Red
Full