Содержание SENSORY SKY 41 260 979-88

Страница 1: ... Sensory Sky ATT Planning guide 02 Positioning recommendations 07 Components 10 Zones of protection 11 Pre wall installation 12 Installation 22 Data and standards 26 Product overview 32 Checklists Culturing Life ...

Страница 2: ...d customized according to the specific needs of the application The hori zontal and vertical distance between the control elements is 90 mm center to center and must not be less The distance between the maximum height of the tallest user and underside of the rain panel should be at least 400 mm 1110 1290 300 720 90 Positioning recommendations Components Zones of protection Pre wall installation In...

Страница 3: ...rain Head spray Body spray Rain curtain Positioning recommendations Components Zones of protection Pre wall installation Installation Data and standards Product overview Checklists Application Types of rain Cold water mist spray Shower zone lights Ambiance lights ...

Страница 4: ... 38 Cold water mist spray Positioning recommendations Components Zones of protection Pre wall installation Installation Data and standards Product overview Checklists Application Types of rain Cold water mist spray Shower zone lights Ambiance lights ...

Страница 5: ... 5 38 Shower zone lights Positioning recommendations Components Zones of protection Pre wall installation Installation Data and standards Product overview Checklists Application Types of rain Cold water mist spray Shower zone lights Ambiance lights ...

Страница 6: ...e 6 38 Ambiance lights Positioning recommendations Components Zones of protection Pre wall installation Installation Data and standards Product overview Checklists Application Types of rain Cold water mist spray Shower zone lights Ambiance lights ...

Страница 7: ...ve Exposed trim parts installation Rain panel control and distribution unit shower board lighting frame Positioning recommendations Components Zones of protection Pre wall installation Installation Data and standards Product overview Checklists Exposed trim parts installation Concealed rough parts installation Peripheral Equipment ...

Страница 8: ... control elements Concealed rough parts for eVALVE Ceiling installation enclosure for rain panel Exposed trim parts installation Concealed rough parts installation Peripheral Equipment Positioning recommendations Components Zones of protection Pre wall installation Installation Data and standards Product overview Checklists ...

Страница 9: ...st not be less than 1 m A heat shield has to be installed between the heat source and the fragrance modules if the required distance of min 1 m cannot be adhered to The area needs to be well ventilated The fragrance modules and the power supply have to be installed separate from each other Distance min 1 m the power supply cables can be extended on site to max 2 m The fragrance modules must not be...

Страница 10: ...ribution board The protection rating of the individual components has to be noted during installation and is only valid when installed correctly Control elements hand shower set and rain panel are operated through safety extra low voltage SELV and can be installed inside safety zone 1 Zones of protection Positioning recommendations Components Zones of protection Pre wall installation Installation ...

Страница 11: ...oncealed rough parts for electronic control elements The proper installation of a pre wall system enables compliance with on site requirements with fire protection heat and noise insulation Pre wall installation systems are available from various manufacturers Pre wall installation Positioning recommendations Components Zones of protection Pre wall installation Installation Data and standards Prod...

Страница 12: ...e is no means of attachment for ceiling installation included among the items supplied The structural engineer must choose the means of attachment for the ceiling construction M8 threaded bolts are used for connection to the ceiling min strength 2000 N Positioning recommendations Components Zones of protection Pre wall installation Installation Data and standards Product overview Checklists Concea...

Страница 13: ...tance to the eVALVE of the hand shower set must be 900 mm The nominal diameter DN 20 has to be adhered to for both pipes and fittings See planning information DN 20 DN 20 Water installation Positioning recommendations Components Zones of protection Pre wall installation Installation Data and standards Product overview Checklists Concealed rough parts rain panel Hand shower set Water installation W...

Страница 14: ... max 60 C Concealed rough parts rain panel Hand shower set Water installation Water installation schema Electrical installation Electrical installation schema Installation pre wall Concealed rough parts for electronic control elements Cutouts anchoring points Trim installation Positioning recommendations Components Zones of protection Pre wall installation Installation Data and standards Product o...

Страница 15: ...alve Backflow preventer Thermometer Circulation pump EN 1717 EN 1717 EN 1717 EN 1717 EN 1717 EN 1717 EN 1717 Shut off Filter Manometer Concealed rough parts rain panel Hand shower set Water installation Water installation schema Electrical installation Electrical installation schema Installation pre wall Concealed rough parts for electronic control elements Cutouts anchoring points Trim installati...

Страница 16: ...ferent See planning information Connecting cable Connecting cable 2x 12V 230V Signal line 3x Fragrance tube Ethernet Ø 32 mm max 12 m Ø 32 mm max 12 m Ø 32 mm max 12 m Electrical installation The installation of the connec ting cable and concealed rough parts for electronic control elements has to occur at the same time that the pre wall is closed Please note the individual cable length see next p...

Страница 17: ... 15 m 15 m The cable length shown here are the delivery status Cables to be provided on site by the customer are marked as such The length of the ductwork for cables has to be shorter see page 16 T T Concealed rough parts rain panel Hand shower set Water installation Water installation schema Electrical installation Electrical installation schema Installation pre wall Concealed rough parts for ele...

Страница 18: ...ng installation enclosure for rain panel and the metal frame of the ceiling structure 140 mm center to center No strain must be transferred from the ceiling structure to ceiling installation enclosure for rain panel min 7 mm max 35 mm min 139 mm Concealed rough parts rain panel Hand shower set Water installation Water installation schema Electrical installation Electrical installation schema Insta...

Страница 19: ...me of the ceiling structure Any strain from the panelling has to be carried by the metal frame of the dry wall The thickness of the wall covering tile stone etc in front of the dry wall panelling gypsum cardboard around the rough parts for electronic control elements is min 7 max 35 mm The installation of the connecting cable and concealed rough parts for electronic control elements has to occur a...

Страница 20: ... parts for electronic control elements are covered by tiles stone and require a hole of 42 x 42 mm Cutouts anchoring points Concealed rough parts rain panel Hand shower set Water installation Water installation schema Electrical installation Electrical installation schema Installation pre wall Concealed rough parts for electronic control elements Cutouts anchoring pointS Trim installation Position...

Страница 21: ...and shower set Water installation Water installation schema Electrical installation Electrical installation schema Installation pre wall Concealed rough parts for electronic control elements Cutouts anchoring points Trim installation Positioning recommendations Components Zones of protection Pre wall installation Installation Data and standards Product overview Checklists ...

Страница 22: ...ncluding the ceiling installation en closure for rain panel and concealed rough parts for eVALVE hand shower set has to be flushed with clean water e g EN 806 4 DIN 1988 2 Compile a flushing report Flushing has to occur prior to installing the trim installation and initial start up Application area The products are not meant to be used outside Consult with Dornbracht if you plan to use the product...

Страница 23: ...ctions The maximum distance between fragrance modules and ceiling installation enclosure for rain panel is 12 m The maximum vertical height between fragrance modules and ceiling installation enclosure for rain panel is 4 m and must not be exceeded Max distance between the ceiling installation enclosure for rain panel and the sub distribution board 12 m Max distance between the fragrance modules an...

Страница 24: ... Ceiling installation enclosure for rain panel Electricity supply input voltage in the sub distribution board 100 240 V AC Electricity supply input voltage in the ceiling installation enclosure for rain panel 12 V DC Input frequency 50 60 Hz Maximum power consumption 180 W Output voltage 12 V DC Output current 3x 5 A Power consumption when not in use 5 W Power consumption in use 160 W System of pr...

Страница 25: ...ethernet cable from sub distribution board to ceiling installation enclosure for rain panel Ø 32 mm max 12 m Ductwork fragrance tubing from ceiling installation enclosure for rain panel to fragrance modules Ø 32 mm max 12 m 2 x Ductwork for signal line and power supply from sub distribution board to fragrance modules Ø 32 mm max 1 m Equipotential bonding for ceiling installation enclosure for conc...

Страница 26: ...r rain panel Concealed rough parts for eVALVE hand shower set Concealed rough parts for electronic control elements SMART TOOLS 4 x Shut off for hot and cold water pipes DN 20 2 x Filter for hot and cold water pipes DN 20 2 x Backflow preventer Type BA according to EN 1717 for hot and cold water pipes SENSORY SKY ATT 41 260 979 88 Brightly polished stainless steel rain panel 85 Chrome complete han...

Страница 27: ...l frame 1140 x 720 mm Shower zone lighting 4x RGBW LED spots Ambient lighting 4x RGB LED light strips IP 55 Power supply 3x power supply 100 240 V AC 12 V DC 50 60 Hz 60 W IP 40 to be mounted to DIN rail AC Filter 230 V 6A DC Filter 12V Additional downloads Installation instructions SENSORY SKY ATT exposed trim parts 41 260 979 Installation instructions SENSORY SKY ATT concealed rough parts 35 260...

Страница 28: ...x Mounting brackets for ceiling connection 2x Supply connection 1 2 female thread cold hot DN 15 3x Fragrance tube 15 m each Connecting cable with preinstalled plugs for concealed rough parts for electronic control elements concealed rough parts eVALVE control module fragrance 1x 15 m 1x 7 5 m 1x 5 m 4x 0 6 m Power supply cable 15 m control unit lights Power supply cable 15 m control unit Ethernet...

Страница 29: ...Valve in combination with complete hand shower set with cover plate Lead free brass concealed body 4x Supply connection 1 2 female thread cold hot DN 15 Dust cover Anti water packing Min recess depth 139 mm eVALVE control module for operating the eVALVE electronic valve IP X4 Concealed rough parts for eVALVE Concealed rough parts eValve Electronic valve Exposed trim parts Complete hand shower set ...

Страница 30: ...SMART TOOLS Concealed rough parts 5x Concealed box for pre wall installation mounting 5x Anti water packing Hole diameter 56 mm Min recess depth 75 mm Control elements Concealed rough parts for electronic control elements SMART TOOLS Concealed rough parts Control element display switch Exposed trim parts Control element rotary knob Exposed trim parts Additional downloads Installation instructions ...

Страница 31: ... x 28 mm to be mounted on DIN rail IP 54 Terminator Additional downloads Installation instructions SENSORY SKY ATT exposed trim parts 41 260 979 Installation instructions SENSORY SKY ATT concealed rough parts 35 260 970 90 110 17 28 40 48 300 193 122 Positioning recommendations Components Zones of protection Pre wall installation Sensory Sky ATT Rain panel Hand shower set Control elements Fragranc...

Страница 32: ... panel has to be chosen based on the ceiling construction Min strength 2000 N Conform to fire protection regulations Calculate the piping e g according to DIN 1988 3 EN 806 3 Calculate optimum choice of hot water storage device e g according to DIN 4708 DIN 1988 20 A pressure reducing valve to be provided by the customer installed after the water meter according to DIN 1988 Main water filter back ...

Страница 33: ... both pipes and fittings A min distance for a circulation pipe DN 15 of 900 mm from the eValve hand shower set is required if a hot water circulation system is installed Leaktest after rough installation according to EN 806 4 DIN 1988 2 Pipe flushing after rough installation according to EN 806 4 DIN 1988 2 Calculate optimum floor drain sizing connected rating 1 5 l s drainage pipe DN 75 calculate...

Страница 34: ...quipotential bonding 2 x 4 mm for ceiling installation enclosure for rain panel and concealed rough part eValve hand shower set have to be provided by the customer The total length of all connecting cables from ceiling installation enclosure for rain panel to concealed rough part eValve to control elements until the control module fragrance in the sub distribution board must not be longer than 30 ...

Страница 35: ...h for ceiling and wall Checked water supply lines for hot water cold water and circulation line min distance 900 mm Flushed pipes with clean water according to EN 806 4 DIN 1988 2 wrote flushing report Checked for leaks according to EN 806 4 DIN 1988 2 wrote test report 2x back flow preventer DN 20 Type BA according to EN 1717 1x hot water 1x cold water installed in accessible area Separate cutoff...

Страница 36: ...hand shower set Installed connecting cables between ceiling installation enclosure for rain panel hand shower set control elements and fragrance control module in sub distribution board Fastened Connecting cables in the pre wall via cable ties Installed all cables without damage to the cables Checked electrical protection for SENSORY SKY ATT Earth leakage circuit breaker 30 mA 2 pin type A Safety ...

Страница 37: ... Installed the terminating resistor Terminator on the last element in the loop connected via connecting cables fragrance control unit Installed specification label in sub distribution board e g door electrical cabinet Installed three power supply units fragrance control module DC Filter and AC filter in sub distribution board Installed Ethernet cable coming from SENSORY SKY ATT in sub distribution...

Страница 38: ...H Co KG Phone 7 499 241 8259 DK SE NO FI IS Dornbracht Nordic A S Phone 45 50 84 54 00 SRB BIH MNE MK HR DOZEN Stars d o o Phone 381 11 22 58 785 AM AZ GE KG TJ TR TM UZ Northern Cyprus Dornbracht Turkey Central Asia Phone 90 0 212 284 9495 UA Lesia Khelemendyk Phone 38 0 44 244 7682 UK IE Dornbracht UK Ltd Phone 44 0 2476 717 129 Central Europe AT CZ SK HU SI Dornbracht Zentraleuropa GmbH Phone 4...

Отзывы: