1
PUMA 480LM
P48LMISE98
Table of Contents
1. Preparations before shipment ............................................................................................. 3
1.1 Installation Site ................................................................................................................ 3
1.2 Foundation Work ............................................................................................................. 5
2. Transportation ...................................................................................................................... 8
2.1 Using the crane ............................................................................................................... 8
2.2 Using the forklift ............................................................................................................... 9
3. What's included .................................................................................................................. 10
4. Second Round of Mortar Injection (Grouting) .................................................................. 12
4.1 Checkpoints before injecting mortar ............................................................................... 12
4.2 Blending the mortar mixture ........................................................................................... 12
4.3 Injecting the mortar mixture ........................................................................................... 13
4.4 Curing the surface of mortar .......................................................................................... 13
5. Connecting the main power and air sources .................................................................... 14
5.1 Connecting the main power source ................................................................................ 14
5.2 Connecting the air source .............................................................................................. 15
6. Checking and fueling the oil tanks .................................................................................... 16
6.1 Hydraulic Unit ................................................................................................................ 16
6.2 Gear Box (2-step) .......................................................................................................... 16
6.3 Lubrication Unit .............................................................................................................. 17
7. Removing the transit clamps ............................................................................................. 20
8. Machine Leveling................................................................................................................ 22
9. Precision Measurement & Correction ............................................................................... 24
9.1 Runout on the spindle & nose ........................................................................................ 24
9.2 Parallelism between center line of spindle and Z-axis movement .................................. 25
9.3 Parallelism between center line of spindle and Z-axis movement .................................. 27
9.4 Precision on the tool post............................................................................................... 28